15 Cuil Na Coille, Slievereagh Ballyvourney Macroom
CONDITIONALPlanning application 10/4901
Cork - Cork County Council
Proposed Development
Internal alterations and ground and first floor extension (133.5 square metres) to an existing dwellinghouse, construction of a shed (13.5 square metres) and an underground rainharvesting tank, provision of solar panel at roof level of house and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
16 Apr 2010
Decision due
10 Jun 2010
Decision: CONDITIONAL
10 Jun 2010
Grant issued
13 Jul 2010
Application Details
- Location
- 15 Cuil Na Coille, Slievereagh Ballyvourney Macroom
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 16 April 2010
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 June 2010
- Grant Date
- 13 July 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of dwellinghouse
Site No 4 Cul na Coille Slievereagh Ballyvourney
Dwellinghouse and removal of disused temporary adjacent sewage treatment plant
Site No.4 Cul na Coille Slievereagh Ballyvourney
Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works.
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach/ Slievereagh, Baile Bhuirne/Ballyvourney, Maigh Chromatha, Macroom, Co. Chorcaí/Co. Cork
An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne Maigh Chromtha, Co. Chorcaí
a dheanamh ar chead chun athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, an An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co.Chorcaí. Tá na leasaithe sea leanas á moladh ar an Fhorbairt a ceadaíodh roimhe seo, (i) an struchtúr aon stór ar chúl an fhoirgneamh atá ann cheana a scartáil, (ii) mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana, (iii) Síneadh nua 3 stór a thógáil, ina mbeidh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgnimh atá ann cheana, (iv) Tógáil 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógáil carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus na hoibreacha suímh ar fad bainteach leo. / Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: (i) Demolition of existing single storey structure to rear, (ii) Minor changes to the layout of the existing building, (iii) Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building, (iv) Construction of 2no above-ground fire-fighting water storage tanks, (v) Construction of car parks, drainage, landscaping, signage and all associated site works.
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne / Ballyvourney Maigh Chromtha/ Macroom, Co.Chorcaí / Co.Cork
Change of use from redundant recording studio to 1 no. dwellinghouse with alterations to elevations and maintaining existing entrance together with associated car parking and ancillary works
The Sulain Studio Slievereagh Ballyvourney Co. Cork
Change of use from redundant recording studio to one number dwellinghouse maintaining existing entrance together with associated car parking and ancillary site works
The Sulain Studio Slievereagh Ballyvourney
Change of use from redundant recording studio to 2 no. semi-detached dwelling houses maintaining existing entrance at Main Street, associated car parking and ancillary site works
The Sulain Studio Slievereagh Ballyvourney, Macroom
Dwellinghouse and garage
Slievereagh Ballyvourney Macroom
Dwellinghouse, garage and treatment plant
Slievereagh Ballyvourney Macroom
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?