← Back to search

Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne / Ballyvourney Maigh Chromtha/ Macroom, Co.Chorcaí / Co.Cork

INCOMPLETED APPLICATION

Planning application 22/6117

Cork - Cork County Council

Proposed Development

a dheanamh ar chead chun athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, an An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co.Chorcaí. Tá na leasaithe sea leanas á moladh ar an Fhorbairt a ceadaíodh roimhe seo, (i) an struchtúr aon stór ar chúl an fhoirgneamh atá ann cheana a scartáil, (ii) mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana, (iii) Síneadh nua 3 stór a thógáil, ina mbeidh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgnimh atá ann cheana, (iv) Tógáil 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógáil carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus na hoibreacha suímh ar fad bainteach leo. / Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: (i) Demolition of existing single storey structure to rear, (ii) Minor changes to the layout of the existing building, (iii) Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building, (iv) Construction of 2no above-ground fire-fighting water storage tanks, (v) Construction of car parks, drainage, landscaping, signage and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Sept 2022

  2. Decision due

    14 Nov 2022

Application Details

Location
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne / Ballyvourney Maigh Chromtha/ Macroom, Co.Chorcaí / Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 September 2022
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
14 November 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22/6433CONDITIONAL27 Oct 2022

Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works.

Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach/ Slievereagh, Baile Bhuirne/Ballyvourney, Maigh Chromatha, Macroom, Co. Chorcaí/Co. Cork

0m
19/5869CONDITIONAL24 Jul 2019

An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork

Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne Maigh Chromtha, Co. Chorcaí

144m
10/4901CONDITIONAL16 Apr 2010

Internal alterations and ground and first floor extension (133.5 square metres) to an existing dwellinghouse, construction of a shed (13.5 square metres) and an underground rainharvesting tank, provision of solar panel at roof level of house and associated site works

15 Cuil Na Coille, Slievereagh Ballyvourney Macroom

175m
15/4464CONDITIONAL10 Mar 2015

Cead pleanala chun (1) Meadu a chur leis an stor do thairge deanta, cuid de'n fhoirgneamh a thogail fe lathair agus (2) Stor athchursala tirim agus clos athchursala, chomaith le oibrithe coimhdeach laithreain, a thogail le hais an monarcha nua do phroiseas bidh le Follain Teo

Eastat Gno Baile Mhuirne An Maigh Reidh/Flats Baile Mhuirne

175m
16/4912CONDITIONAL22 Apr 2016

Fo-Staisiun Leictreach agus Seomra Lasc lena hais, cho maith le oibrithe coimhdeach laithreain, a thogail le hais an Monarcha Nua do Phroiseas Bidh le Follain Teo (Electrical substation and switch room which will be located within the site boundaries of the new food process facility)

Eastat Gno Baile Mhuirne An Maigh Reidh, Flats Baile Mhuirne Co. Chorcai

177m
13/4748CONDITIONAL23 Apr 2013

Cead Pleanála chun monarcha próiseas bidh a thógáil, ina mbeidh áiseanna ullmhúcháin bidh, proiseas and pacaistiocht, stór do earraí deanta, seomraí gaileadán agus innealra, oifigí. Gailearaí feachana agus siopa do chuairteoirí, bealach isteach agus amach do fheithiclí, áiseanna pairceáil agus cúrsaiochta, corais draenala searachais agus baistí, comharthaí agus oibreacha coimhdeach laithreain. Permission for construction of a food processing factory which will include food preparation facilities, processing and packaging, a store for finished products, boiler and machinery rooms, offices, a viewing gallery and shop for visitors, entrance and egress for vehicles, parking and circulation facilities, sewage and rainwater drainage systems, signs and all associated site works

Eastat Gno Baile Mhuirne, An Maigh Reidh Baile Mhuirne, Co.Chorcai Ballyvourney Industrial Estate, Flats Ballyvourney, Co.Cork

183m
11/6012REFUSED20 Sept 2011

Construction of dwellinghouse

Site No 4 Cul na Coille Slievereagh Ballyvourney

184m
07/12069NEW APPLICATION1 Nov 2007

Dwellinghouse and removal of disused temporary adjacent sewage treatment plant

Site No.4 Cul na Coille Slievereagh Ballyvourney

199m
19/6193CONDITIONAL5 Sept 2019

1) Cead Pleanala a fhail le foirgneamh storala breise le framai cruach iarainn a thogail mar mheadu achair ar an bhFoirgneamh Storala ata togtha cheana fein (faoi Cead Pleanala 18/06386), chomaith le oibrithe coimdeach laithreain ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Follain Teo. 2) Cead Pleanala a fhail le paneil fotavoltach greine a chur ar dhionta an priomh Monarcha Phroiseas Bidh agus an Foirgneamh Storala. [1) Permission for construction of an additional steel framed storage building, thus extending the area of the existing storage building (granted under Planning Ref: No: 18/6386) as well as associated site works on the site close to the new Follain Teo food processing factory. 2) Permission to install a photovoltaic solar panel on the roof of the main food processing factory and the storage building].

Eastat Gno Baile Mhuirne/Ballyvourney Ind Estate An Maigh Reidh/Flats Baile Mhuirne/Ballyvourney Contae Chorcai/County Cork

202m
17/5675INCOMPLETED APPLICATION3 Jul 2017

Permission for a 201.04KW Solar Photovoltaic (PV) array to be mounted on the roof top of the existing building at Ballyvourney Industrial Estate. The Solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs.

Ballyvourney Industrial Estate, Flats Ballyvourney Co.Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?