Castlepook North Carker North Ballyhoura
CONDITIONALPlanning application 11/4947
Cork - Cork County Council
Proposed Development
The development will consist of a Wind Energy Project comprising 14 wind turbines, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, two anemometer masts, borrow pits and all associated site works, above and below ground. Each wind turbine will have an overall maximum dimension of 126 metres, comprising a tower 80-85 metres high, with a diameter of about 4 metres at the base, to which three blades of 41-45 metres length will be attached.
Application Timeline
Application received
3 May 2011
Decision due
12 Mar 2012
Decision: CONDITIONAL
12 Mar 2012
Application Details
- Location
- Castlepook North Carker North Ballyhoura
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 3 May 2011Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 March 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Minor modifications to the previously approved Castlepook Wind Farm development comprising 14no. wind turbines (An Bórd Pleanála Ref. PL04.240434, and Cork County Council Ref. No. 11/4947). The development will consist of an increase in the maximum overall dimensions of the 14 permitted wind turbines (from 126m to 135m); substitution of 2no. permitted guyed anemometer masts with 2no. free standing anemometer masts with a height corresponding to the amended wind turbine towers; realignment of the access to a number of the wind turbines and all associated site works above & below ground
Castlepook North Carker North Ballyhoura Co.Cork
Minor modifications to the permitted Castlepook wind farm development consisting of an increase in the maximum overall dimensions of the 14no. permitted wind turbines (from 126m to 135m); substitution of 2no. permitted guyed anemometer masts with 2no. free standing anemometer masts with a height corresponding to the amended wind turbine towers; realignment of the access to a number of wind turbines; and all associated site works, above and below ground
Castlepook North Carker North Ballyhoura Co.Cork
Minor modifications to the previously approved Castlepook Wind Farm development comprising 14 wind turbines (An Bord Pleanala Ref. PL 04.240434, Cork County Council Ref. 11/4947). The development will consist of an increase in the maximum overall dimensions of the 14 permitted wind turbines (from 126m to 135m); substitution of two permitted guyed anemometer masts with two free-standing anemometer masts with a height corresponding to the amended wind turbine towers, which will be a maximum of 90m; realignment of the access to turbines No. T2, T4 and T10; and all associated site works, above and below ground.
Castlepook North Carker North Ballyhoura
80 metre high guyed anemometer mast
Carker North Ballyhoura Mountains
Windfarm to include 12 no. turbines, 50m anemometer mast, control building/ switchyard,fencing & access tracks
CASTLEPOOK NORTH, CASTLEPOOK NORTH,
Erection of 36m telecommunications structure carrying antennae, 2 no. equipment containers within a fenced compound and access track
Ballyhoura Carker North
Completion of a 36m telecommunications support structure carrying antennae and 2no. equipment containers within a fenced compound and access track
Ballyhoura Carter North Co Cork
Amended electrical transformer station at Castlepook Windfarm (pl04.240434 and Ref. No. 11/4947). The development will consist of a 38kV electrical transformer station comprising 2no. single storey control buildings and a substation with associated outdoor electrical equipment, including transformers, lightning protection masts and SCADA pole; effluent holding tanks, internal roads, boundary fencing around the perimeter of the compound, associated access track and all other associated site development works above & below ground
Castlepook North Ballyhoura Co.Cork
Permission to substitute the electrical transformer station Permitted under Planning Ref. No. 11/4947 (An Bórd Pleanála Ref. No. pl 04.240434) for Castlepook wind farm with a relocated and larger Electrical Transformer Station comprising 2no. single storey control buildings with associated outdoor electrical equipment, including transformers, lightning protection masts and SCADA pole; effluent holding tanks, internal roads, boundary fencing around the perimeter of the compound, associated access track and all other associated site development works above & below ground
Castlepook Wind Farm Castlepook North Ballyhoura Co.Cork
Replacement of an existing telecommunications mast 10m high with one of 18m in height, so as to continue to supply a Broadband and Phone service from existing compound. The existing 7 dishes and 2 antennae will be transported across to the new mast and 8 new dishes will be added to enhance the service. Four of the five cabins on site, will be retained including one for the Limerick Fire Service
Ballyhoura Mountains Carker North Ballycoskery Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?