Proposed Development
Construction of a Maritime Research and Testing Centre on lands 1.82ha. adjacent to the National Maritime College of Ireland (NMCI). The proposed development includes the construction of a new vehicular access road and footpath to the site from the public road near the bridge to Rocky Island and Haulbowline Island and the demolition of the existing disused warehouse circa 3,883 sq.m. area. The new building will comprise a single storey, high volume marine testing facility with overall height varying from 8m to 10m approx. and a research facility three storeys high, overall height c.19.37m, total floor area 5,132 sq.m. Ancillary to the building are internal access roads, parking to be provided in two phases up to a total of 89 car parking and 10 bicycle parking spaces in a covered bay, a separate ESB sub station and switchroom, storage bins for materials, a pumping station, windbreak to terrace, boundary fence treatment including two gates to NMCI, one gate to access road, also panel sign at proposed new access point on Haulbowline Road, exterior lighting and hard and soft landscaping.
Application Timeline
Application received
8 Jul 2011
Decision: CONDITIONAL
19 Dec 2011
Decision due
22 Dec 2011
Grant issued
2 Feb 2012
Application Details
- Location
- Haulbowline Road Ringaskiddy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 July 2011Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 December 2011
- Grant Date
- 2 February 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the relocation and erection of a small micro generation research wind turbine at the north -eastern corner of the site. The wind turbine will be used to provide power to the Beaufort Building and for the educational purposes. The project involves: 1) construction of a concrete foundation for the turbine (measuring 12.25m2), 2) erection of the tower and turbine (metal lattice tower and turbine with tip height of 19.1m) and 3) associated site works, fencing and utility connections
Beaufort Building - Environmental Research University College Cork, Haulbowline Road Loughbeg, Ringaskiddy Co.Cork
Removal of three car parking spaces and the erection of a research container unit.
Beaufort Building - Environmental Research Institute University College Cork Haulbowline Road Loughbeg Ringaskiddy Co Cork
Widening of existing entrance, relocation of existing front road boundary fence, relocation of weighbridge, change of use of building 1 & 2 from bulk storage of granulated fertilizer to accommodate port related activities including storage and screening of wood pellets, timber, feedstuffs and non hazardous fertilizers routed through Port of Cork and open storage of finished product on pallets
Ringaskiddy
Widening of existing entrance, relocation of existing front road boundary fence, relocation of weighbridge, change of use of Building No's 1 & 2 to accommodate port related activities to include storage and screening of wood pellets, timber, feedstuffs and non hazardous fertilizers routed through Port of Cork and open sotrage of finished product on pallets
Ringaskiddy
Change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile cold bitumen recycling mixing equipment
Ringaskiddy Co. Cork .
For the change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile mixing equipment
Ringaskiddy Co.Cork .
Conversion of industrial storage facility in a former magazine building to crematorium with associated site works
Rocky Island Ringaskiddy
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy Co. Cork
Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years