Proposed Development
Retention of a 107 square metre single storey timber framed structure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Application Timeline
Application received
25 Nov 2011
Decision due
30 Jan 2012
Application Details
- Location
- Loughbeg Ringaskiddy .
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 25 November 2011
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 30 January 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Retention of a 107 square meter single storey timber framed structure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas.
Loughbeg Ringaskiddy Co. Cork
Retention of 107sq.m single storey timber framed strucure for office use within the loading bay area to the north of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas.
Loughbeg Ringaskiddy Co. Cork
Construction of new biomass boiler house incorporating a storage bunker
Depuy (Ireland) Ltd. Loughbeg Ringaskiddy
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Construction of new biomass boiler house incorporating a storage bunker
Loughbeg Ringaskiddy
Construction of extension of 2394sqm to the existing production & plant area & reconfiguration of the existing car park layout & associated site works
DePuy (Ireland) Ltd Loughbeg Ringaskiddy
(a) an extension to previously granted permission, planning registration reference 06/8591, for a 240 square metre two storey office structure to the east side of the existing manufacturing facility (b) the retention of a 107 square metre single storey timber framed structure within the loading bay area to the north (c) the construction of a 222 sq metre single storey extension to open roofed waste storage compound to the north west increasing the total area for the compound to 422 sq metres, the original compound was previously granted permission, planning registration reference 06/8591 (d) the construction of a new 175 sq metre partially covered recycling area to the west of the site (e) the retention of a section of existing inner service link road to the east and (f) the construction of 70 car spaces to the south; all with associated site works. All of the above facilities are ancillary to the existing production and plant areas located at DePuy (Ireland)
Depuy (Ireland) Loughbeg Ringaskiddy
The addition of 30 meters squared of glazing at first floor level to the western façade of the existing manufacturing facility
Loughbeg Ringaskiddy Co. Cork Co. Cork
Construction of new transformer building to rear of existing ESB sub-station and construction of new roof and cable gantry over the existing ESB sub-station and associated site works
DePuy Ireland Ltd Loughbeg Ringaskiddy
Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.
Loughbeg Ringaskiddy Co. Cork
The submission window has closed
Observations on this application closed on Saturday 7 January 2012, five weeks after it was received. The authority cannot accept a late submission.