Proposed Development
(a)Erection of four 250m3 (13metres high) storage tanks in the area of the existing waste water treatment facility, involving the demolition of two existing redundant shed buildings. (b)Removal/demolition of two existing redundant waste water treatment tanks and the construction of a decanter, control and plant room building of 211m2 (7.5 meters high) in the area of the existing waste water treatment facility, above a redundant bund that will become a basement space designated for future use as a plant room. (c)The construction of a 6.25m2 (3.3 metres high) storm water monitoring building, at the southern end of the facility. Associated site works will consist of paths and landscaping
View the full application file on the council's planning portal →Application Timeline
Application received
23 May 2012
Decision: CONDITIONAL
12 Jul 2012
Decision due
17 Jul 2012
Grant issued
17 Aug 2012
Application Details
- Location
- Brinny Innishannon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 May 2012
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 July 2012
- Grant Date
- 17 August 2012
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
4.5m high 120sqm single storey building to house MV switch gear & secondary equipment for a MV substation
Brinny
4.5m high 120 sq.m single storey building to house MV switchgear and secondary equipment for an MV substation
Brinny Innishannon
The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)
Brinny Innishannon Co.Cork
The construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22).
Brinny Innishannon Co.Cork
Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Works to existing building 22 fermentation building previously granted permission under Planning Reg. No. S/93/464 consisting of:[a] elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associted paths and landscaping, and [b] retention of existing extension to the south east corner of the building on the ground and first floors
Brinny Innishannon
(a) 2 no. external enclosed lifts (1no. personnel/accessible lift from ground floor to first floor on the eastern elevation (including ground floor canopy) and 1 no. goods/personnel lift from ground floor to roof level (including lift lobby at roof level) on the western elevation; (b) a partial internal mezzanine floor over the existing first floor for the storage of mechanical equipment; (c) additional mechanical plant at roof level, including AHUs, extract fans, electrical room, CSR, equipment platform, chiller and vents; (d) part replacement of existing external cladding at first floor level with new fenestration on all elevations; and (e)all associated modifications and site development works to the existing Building 22 at facility. This application relates to a development which comprises an activity for which an Industrial Emissions Licence under Part IV of the Environmental Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
A 50sqm single storey extension to building 22, which will be used for the purposes of gowning, staging and entry into an existing laboratory, including all associated modifications and site development works. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Permission for (A) Single storey extension to existing laboratory building (Building 22) with external mechanical plant platform (above roof of extension). (B) Elevational modifications to building 22 and associated site works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
Brinny, Innishannon, Co. Cork, T12 RD82
Permission for a) Single storey extension with external mechanical plant platform (above roof of extension) to building 22, b) Elevational modifications to building 22, c) Associated site development works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
MSD Brinny Innishannon Co. Cork