← Back to search

Brinny Innishannon

CONDITIONAL

Planning application 09/6835

Cork - Cork County Council

Proposed Development

4.5m high 120 sq.m single storey building to house MV switchgear and secondary equipment for an MV substation

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Aug 2009

  2. Decision: CONDITIONAL

    7 Oct 2009

  3. Decision due

    21 Oct 2009

  4. Grant issued

    9 Nov 2009

Application Details

Location
Brinny Innishannon
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
27 August 2009
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 October 2009
Grant Date
9 November 2009

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
09/6689INCOMPLETED APPLICATION11 Aug 2009

4.5m high 120sqm single storey building to house MV switch gear & secondary equipment for a MV substation

Brinny

46m
11/6681INCOMPLETED APPLICATION22 Dec 2011

Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m

Brinny Innishannon Co. Cork

46m
12/4032CONDITIONAL12 Jan 2012

Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m.

Brinny Innishannon Co. Cork

86m
12/5083CONDITIONAL23 May 2012

(a)Erection of four 250m3 (13metres high) storage tanks in the area of the existing waste water treatment facility, involving the demolition of two existing redundant shed buildings. (b)Removal/demolition of two existing redundant waste water treatment tanks and the construction of a decanter, control and plant room building of 211m2 (7.5 meters high) in the area of the existing waste water treatment facility, above a redundant bund that will become a basement space designated for future use as a plant room. (c)The construction of a 6.25m2 (3.3 metres high) storm water monitoring building, at the southern end of the facility. Associated site works will consist of paths and landscaping

Brinny Innishannon

89m
15/5121INCOMPLETED APPLICATION28 May 2015

Retention of roof mounted louver screening and associated roof plant and equipment. The application related to development previously permitted under Planning Ref. No. 13/4647

Brinny Innishannon Co.Cork

90m
17/5829CONDITIONAL17 Jul 2017

A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence

Brinny Innishannon Co. Cork

114m
22/4275CONDITIONAL11 Feb 2022

The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)

Brinny Innishannon Co.Cork

114m
21/4848CONDITIONAL6 Apr 2021

A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.

Brinny Innishannon Co. Cork

132m
17/6515INCOMPLETED APPLICATION28 Sept 2017

The construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22).

Brinny Innishannon Co.Cork

133m
18/4345CONDITIONAL9 Feb 2018

Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.

Brinny Innishannon Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?