Brinny Innishannon Co.Cork
INCOMPLETED APPLICATIONPlanning application 15/5121
Cork - Cork County Council
Proposed Development
Retention of roof mounted louver screening and associated roof plant and equipment. The application related to development previously permitted under Planning Ref. No. 13/4647
View the full application file on the council's planning portal →Application Timeline
Application received
28 May 2015
Decision due
22 Jul 2015
Application Details
- Location
- Brinny Innishannon Co.Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 May 2015
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 22 July 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence
Brinny Innishannon Co. Cork
Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m
Brinny Innishannon Co. Cork
Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m.
Brinny Innishannon Co. Cork
(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.
Brinny Innishannon
A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
4.5m high 120sqm single storey building to house MV switch gear & secondary equipment for a MV substation
Brinny
4.5m high 120 sq.m single storey building to house MV switchgear and secondary equipment for an MV substation
Brinny Innishannon
A single storey extension to the rear of the OPS 2 building to house a product line conveyor, (floor area of 41.7m²) and associated site works
Brinny Innishannon Co Cork
The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)
Brinny Innishannon Co.Cork
Permission for Retention of roof mounted louver screening and associated roof plant and equipment on the operations No. 2 Building. This application relates to previously permitted development under Planning Ref. No. 13/4647 this application relates to development which comprises of activity which requires an integrated pollution permission and control licence.
Brinny Innishannon Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.