Proposed Development
(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.
View the full application file on the council's planning portal →Application Timeline
Application received
22 Feb 2011
Decision: CONDITIONAL
15 Apr 2011
Decision due
18 Apr 2011
Grant issued
23 May 2011
Application Details
- Location
- Brinny Innishannon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 February 2011
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 April 2011
- Grant Date
- 23 May 2011
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence
Brinny Innishannon Co. Cork
Retention of roof mounted louver screening and associated roof plant and equipment. The application related to development previously permitted under Planning Ref. No. 13/4647
Brinny Innishannon Co.Cork
A single storey extension to the rear of the OPS 2 building to house a product line conveyor, (floor area of 41.7m²) and associated site works
Brinny Innishannon Co Cork
Permission for Retention of roof mounted louver screening and associated roof plant and equipment on the operations No. 2 Building. This application relates to previously permitted development under Planning Ref. No. 13/4647 this application relates to development which comprises of activity which requires an integrated pollution permission and control licence.
Brinny Innishannon Co. Cork
Single storey equipment store room extension, a roof access stairs, (floor area of 166sqm) associated site works and the addition of new fire escape doors all to the existing OPS 2 building.
Brinny Innishannon Co.Cork
A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Construction of 11m high two storey extension over basement to northern elevation of existing Operations 2 building No. 19 to provide further production space within existing pharmaceutical facility
Brinny Innishannon
Retention of alterations to the permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift & the Operations 1 building, from 11.2sqm to 22.9sqm, (2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) & the extension of the canopy roof over the Yard Enclosure to form a weather tight storage building (65.4sqm)
Brinny Innishannon
Construction of two storey modular office building extension to existing single storey locker room building within Pharmaceutical Production facility
Brinny Innishannon
Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m
Brinny Innishannon Co. Cork