Proposed Development
A single storey extension to the rear of the OPS 2 building to house a product line conveyor, (floor area of 41.7m²) and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
2 Oct 2014
Decision: CONDITIONAL
21 Nov 2014
Decision due
26 Nov 2014
Grant issued
8 Jan 2015
Application Details
- Location
- Brinny Innishannon Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 2 October 2014
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 November 2014
- Grant Date
- 8 January 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for Retention of roof mounted louver screening and associated roof plant and equipment on the operations No. 2 Building. This application relates to previously permitted development under Planning Ref. No. 13/4647 this application relates to development which comprises of activity which requires an integrated pollution permission and control licence.
Brinny Innishannon Co. Cork
Single storey equipment store room extension, a roof access stairs, (floor area of 166sqm) associated site works and the addition of new fire escape doors all to the existing OPS 2 building.
Brinny Innishannon Co.Cork
(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.
Brinny Innishannon
Construction of single storey steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of two storey extension and single storey extension to eastern elevation and two storey extension to Western elevation to OPS 2 Production building
Brinny Innishannon
Extension to fermentor building, to house contingency fermentor, link corridor & a 2 storey extension to utilities bay to service the fermentor
BRINNY, BRINNY,
Extensions to existing Operations 2 building to provide additional production, office and storage accommodation comprising of two storey extension and single storey extension to Eastern elevation and two storey extension to Western elevation
Brinny Innishannon
Demolition of a single storey solvent washroom annex to existing production building and construction of extension to house production plant
Brinny, Innishannon
Construction of phased extensions to existing OPS 2 Production Building comprising of two storey extension to eastern elevation and two storey extension to western elevation
Brinny Innishannon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?