Brinny Innishannon Co. Cork

CONDITIONAL

Planning application 21/4848

Cork - Cork County Council

Proposed Development

A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Apr 2021

  2. Decision: CONDITIONAL

    25 May 2021

  3. Decision due

    31 May 2021

  4. Grant issued

    28 Jun 2021

Application Details

Location
Brinny Innishannon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
6 April 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 May 2021
Grant Date
28 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

56m
17/5829CONDITIONAL17 Jul 2017

A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence

Brinny Innishannon Co. Cork

56m
15/5121INCOMPLETED APPLICATION28 May 2015

Retention of roof mounted louver screening and associated roof plant and equipment. The application related to development previously permitted under Planning Ref. No. 13/4647

Brinny Innishannon Co.Cork

73m
17/6716CONDITIONAL19 Oct 2017

Demolition of an existing storage shed and the construction of a two storey modular office building, including an external stairs, pedestrian access ramp, and associated development site and landscaping works at facility. This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.

Brinny Innishannon Co. Cork

76m
22/4275CONDITIONAL11 Feb 2022

The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)

Brinny Innishannon Co.Cork

81m
11/6681INCOMPLETED APPLICATION22 Dec 2011

Construction of a single storey personnel and material access link (floor area of 24.2m2), with associate site works, located between the existing operation's building 1 (OPS1) to the existing storage and lift building. The height of proposed link is 5m

Brinny Innishannon Co. Cork

81m
12/4032CONDITIONAL12 Jan 2012

Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m.

Brinny Innishannon Co. Cork

83m
11/4339CONDITIONAL22 Feb 2011

(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities.

Brinny Innishannon

97m
17/6515INCOMPLETED APPLICATION28 Sept 2017

The construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22).

Brinny Innishannon Co.Cork

97m
18/4345CONDITIONAL9 Feb 2018

Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.

Brinny Innishannon Co. Cork

112m
17/5507INCOMPLETED APPLICATION15 Jun 2017

A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution permission and control license.

Brinny Innishannon Co. Cork Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?