Extending the existing car park by 96 spaces, comprising of new dense bitumen macadam surface, additional footpaths, smoking shelter, lighting, drainage and all associated site works. This application relates to development which comprises of an activity whcih requires an integrated pollution prevention and control licence.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Sept 2014

  2. Decision due

    3 Nov 2014

Application Details

Location
Barnahely Ballybricken Ringaskiddy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
8 September 2014
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
3 November 2014

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
19/4042CONDITIONAL14 Jan 2019

Stainless steel frame smoking shelter perimeter fencing and associated ancillary site works at existing facility. The facility is subject to an Integrated Pollution Prevention and Control Licence.

Barnahely Ringaskiddy Co. Cork

170m
25/4704Conditional Permission17 Apr 2025

Permission for an upgrade and extension to the existing biomedicines manufacturing facility, including: 1) construction of a part single-storey and part two-storey extension to the northern elevation of the existing production building P01 with total floorspace of c. 1,718 sqm and a maximum height of c23.01m, 2) construction of a new medium voltage and low voltage (MV &LV) electrical sub-station with 2 no. single storey over service void building units with total floorspace of c.346sqm and maximum height c.6.33m, and to include a back-up generator, 3) construction of an extension to the existing central utility plant (CUP) to accommodate new boiler, heat pumps and plant rooms with total floorspace of c.482sqm and maximum height to parapet, c.14.2m and to include demolition of an existing boiler house of 68.6sqm, 4) works to upgrade and expand the existing on-site Waste Water Treatment plant (WWTP) incorporating new plant and equipment for increased hydraulic and biological treatment capacity; including a new single storey electrical substation with total floorspace of c.233sqm and maximum height c.5.29m, back-up generator, cooling towers, and odour control unit, 5) all associated site development, landscaping and ancillary works including re-profiling of the earthen berms in the vicinity of the WWTP and associated demolition works, boundary fencing, underground services, high-level pipe and cable racks, internal site roads, yards and temporary construction compounds. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (reg. no. P0778-02). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the development.

Barnahely Ringaskiddy Co.Cork

187m
24/4910CONDITIONAL20 May 2024

Permission for the construction of extensions to the canteen facilities at our existing bio-pharmaceuticals manufacturing facility. The proposed development will comprise: i) a c.93sqm single storey extension to the northern side of the existing canteen to facilitate additional seating, and ii) a c.90 sqm extension to the southern side of the canteen to facilitate additional kitchen space. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. no. P0779-02)

Barnahely Ringaskiddy Co.Cork

190m
06/9808CONDITIONAL16 Aug 2006

Installation of new windows and entrance doors to eastern elevation of existing warehouse storage, general distribution and logistics and associated offices building

Barnahely Ringaskiddy

190m
06/8875INCOMPLETED APPLICATION13 Jul 2006

New windows and entrance doors to existing building

Barnahely Ringaskiddy

208m
08/4115CONDITIONAL11 Jan 2008

Internal subdivision of existing office accommodation ancillary to warehouse, storage, distribution and logistics facility and change of use from office use ancillary to the aforementioned facility to office use for general port-related activities use, provision of addition car parking spaces and all associated site works and services

Barnahely Ringaskiddy

218m
15/5315CONDITIONAL17 Jun 2015

A 65sqm extension to existing plant room located on the third floor of the existing administration building

Barnahely Ringaskiddy Co.Cork

226m
13/6217CONDITIONAL22 Nov 2013

A single storey building extension, (total floor area of 460m2) consisting of a freezer store room, electrical room and gowning area including a roof access stairs, and all associated site works. The application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence.

Barnahely Ringaskiddy

249m
14/4676CONDITIONAL3 Apr 2014

Relocation of existing stone boundary wall on IDA property adjacent to the access road to the Janssen Biologics manufacturing facility and re-grading of the embankment between the new wall location and the R613 roadway to provide enhanced sightlines for the access road to the facility

Barnahely Ringaskiddy Co.Cork

250m
22/4608CONDITIONAL16 Mar 2022

(i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)

Barnahely Ringaskiddy Co.Cork

The submission window has closed

Observations on this application closed on Sunday 12 October 2014, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?