Stainless steel frame smoking shelter perimeter fencing and associated ancillary site works at existing facility. The facility is subject to an Integrated Pollution Prevention and Control Licence.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Jan 2019

  2. Decision: CONDITIONAL

    21 Feb 2019

  3. Decision due

    11 Mar 2019

  4. Grant issued

    13 May 2019

Application Details

Location
Barnahely Ringaskiddy Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
14 January 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 February 2019
Grant Date
13 May 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
14/5899INCOMPLETED APPLICATION8 Sept 2014

Extending the existing car park by 96 spaces, comprising of new dense bitumen macadam surface, additional footpaths, smoking shelter, lighting, drainage and all associated site works. This application relates to development which comprises of an activity whcih requires an integrated pollution prevention and control licence.

Barnahely Ballybricken Ringaskiddy

207m
25/4704Conditional Permission17 Apr 2025

Permission for an upgrade and extension to the existing biomedicines manufacturing facility, including: 1) construction of a part single-storey and part two-storey extension to the northern elevation of the existing production building P01 with total floorspace of c. 1,718 sqm and a maximum height of c23.01m, 2) construction of a new medium voltage and low voltage (MV &LV) electrical sub-station with 2 no. single storey over service void building units with total floorspace of c.346sqm and maximum height c.6.33m, and to include a back-up generator, 3) construction of an extension to the existing central utility plant (CUP) to accommodate new boiler, heat pumps and plant rooms with total floorspace of c.482sqm and maximum height to parapet, c.14.2m and to include demolition of an existing boiler house of 68.6sqm, 4) works to upgrade and expand the existing on-site Waste Water Treatment plant (WWTP) incorporating new plant and equipment for increased hydraulic and biological treatment capacity; including a new single storey electrical substation with total floorspace of c.233sqm and maximum height c.5.29m, back-up generator, cooling towers, and odour control unit, 5) all associated site development, landscaping and ancillary works including re-profiling of the earthen berms in the vicinity of the WWTP and associated demolition works, boundary fencing, underground services, high-level pipe and cable racks, internal site roads, yards and temporary construction compounds. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (reg. no. P0778-02). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the development.

Barnahely Ringaskiddy Co.Cork

210m
24/4910CONDITIONAL20 May 2024

Permission for the construction of extensions to the canteen facilities at our existing bio-pharmaceuticals manufacturing facility. The proposed development will comprise: i) a c.93sqm single storey extension to the northern side of the existing canteen to facilitate additional seating, and ii) a c.90 sqm extension to the southern side of the canteen to facilitate additional kitchen space. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. no. P0779-02)

Barnahely Ringaskiddy Co.Cork

216m
06/9808CONDITIONAL16 Aug 2006

Installation of new windows and entrance doors to eastern elevation of existing warehouse storage, general distribution and logistics and associated offices building

Barnahely Ringaskiddy

216m
06/8875INCOMPLETED APPLICATION13 Jul 2006

New windows and entrance doors to existing building

Barnahely Ringaskiddy

225m
13/6217CONDITIONAL22 Nov 2013

A single storey building extension, (total floor area of 460m2) consisting of a freezer store room, electrical room and gowning area including a roof access stairs, and all associated site works. The application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence.

Barnahely Ringaskiddy

231m
08/4115CONDITIONAL11 Jan 2008

Internal subdivision of existing office accommodation ancillary to warehouse, storage, distribution and logistics facility and change of use from office use ancillary to the aforementioned facility to office use for general port-related activities use, provision of addition car parking spaces and all associated site works and services

Barnahely Ringaskiddy

231m
15/5315CONDITIONAL17 Jun 2015

A 65sqm extension to existing plant room located on the third floor of the existing administration building

Barnahely Ringaskiddy Co.Cork

240m
21/5480CONDITIONAL27 May 2021

The construction of a warehouse building for storage, distribution and manufacturing, with ancillary 2-storey offices, staff facilities, parking, entrance off existing public road and all associated site works.

Barnahely Ringaskiddy Co. Cork

242m
14/4676CONDITIONAL3 Apr 2014

Relocation of existing stone boundary wall on IDA property adjacent to the access road to the Janssen Biologics manufacturing facility and re-grading of the embankment between the new wall location and the R613 roadway to provide enhanced sightlines for the access road to the facility

Barnahely Ringaskiddy Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?