Proposed Development
The demolition of an existing warehouse building and construction of a new building for expansion of their R&D Facility and car parking area, construction of a new substation, boiler house, covered bin store, MCC room, external air handling unit and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
22 Jan 2016
Decision: CONDITIONAL
14 Mar 2016
Decision due
18 Mar 2016
Grant issued
27 May 2016
Application Details
- Location
- Ballytrasna Little Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 January 2016
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 March 2016
- Grant Date
- 27 May 2016
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of an existing warehouse building and construction of a new building for the expansion of R & D Facility and carpark area, construction of a new substation and all associated site works
Ballytrasna Little Island
Extension to the existing Aislinn unit at the North of thier site at Little Island Business Park, to accommodate a new Laboratory at ground floor and associated offices at first floor along with all associated site works
Little Island Business Park Ballytrasna Little Island Co. Cork
(1) The demolition of the existing Emerald and Inis Buildings. (2) the construction of a two storey research and development facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to rear at first floor level, storage areas, link at ground and first floor level to the existing research and development facility. (3) the existing canopy walkway to the rear of the O’Neill’s building to be demolished. (4) The retention of the existing lay-by. (5) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match existing with sliding gates and pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (6) The construction of a new service yard and associated vehicular entrance to the east of the building, waste compound and gas bottle storage area. (7) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels. (8) the installation of a new bicycle stand, new road crossings a revised parking layout to the east of O’Neill’s Building and all associated site works.
Little Island Business Park Ballytrasna Little Island Co. Cork
The construction of a new two storey filling hall extension and all associated site works at the plant.
Little Island Business Park Ballytrasna Little Island Co. Cork
(1) the demolition of the existing Emerald and Inis Buildings and canopy walkway to the rear O’Neill’s Building (2) the construction of a two storey Research & Development Facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to the rear at first floor level, storage areas, link at ground and first floor level to the existing Research & Development Facility. (3) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match exiting with sliding gates & pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (4) The construction of a new service yard & associated vehicular entrance to the east of the building, waste compound & gas botte storage area (5) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels (6) The installation of a bicycle stand, two new road-crossings and a revised parking layout to the east of O’Neill Building and all associated site works. (7) and are also applying for permission for retention of existing roadside lay-by. All at their plant at Little Island Business Park.
Little Island Business Park Ballytrasna Little Island Co. Cork
The construction of extensions to the R&D Facilities including a two story office and circulation space with entrance canopy extension to the front (South) of the building, a new entrance, stairwell and meeting room at the East side of the building, new first floor toilets and a new utility building to the North side of the building, a new stairwell to the West of the building, new palisade fencing along South and East of the site and all associated site works at the plant.
Little Island Business Park Ballytrasna Little Island Co. Cork
Erection of an ESB Sub-Station adjoining switch room with associated site works
Adjacent to Unit 9 Site Cast Industrial Estate Ballytrasna Little Island Co Cork
Erection of an ESB Sub-Station and switch room with associated site works.
Adjacent to Unit 9 Sitecast Industrial Estate Ballytrasna, Little Island Co. Cork
Alterations to front elevation of the Aislinn Building to macth adjacent R&D Building
Little Island Industrial Estate Ballytrasna Little Island
Alterations to the front elevation of the Aislinn Building to match adjacent R & D Building
Little Island Industrial Estate Ballytrasna, Little Island Co Cork