Adjacent to Unit 9 Sitecast Industrial Estate Ballytrasna, Little Island Co. Cork
CONDITIONALPlanning application 18/4568
Cork - Cork County Council
Proposed Development
Erection of an ESB Sub-Station and switch room with associated site works.
View the full application file on the council's planning portal →Application Timeline
Application received
8 Mar 2018
Decision: CONDITIONAL
25 Apr 2018
Decision due
2 May 2018
Grant issued
31 May 2018
Application Details
- Location
- Adjacent to Unit 9 Sitecast Industrial Estate Ballytrasna, Little Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 March 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 25 April 2018
- Grant Date
- 31 May 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of an ESB Sub-Station adjoining switch room with associated site works
Adjacent to Unit 9 Site Cast Industrial Estate Ballytrasna Little Island Co Cork
Demolition of an existing warehouse building and construction of a new building for the expansion of R & D Facility and carpark area, construction of a new substation and all associated site works
Ballytrasna Little Island
The demolition of an existing warehouse building and construction of a new building for expansion of their R&D Facility and car parking area, construction of a new substation, boiler house, covered bin store, MCC room, external air handling unit and all associated site works
Ballytrasna Little Island Co. Cork
Construct extensions to the front and rear of existing commercial premises and Permission for Retention of first floor mezzanine area.
Little Island Industrial Estate Ballytrasna Td., Little Island Co. Cork
Construction of light industrial unit, new entrance to existing light industrial unit, additional car park, new storm water connection to existing storm water sewer
Sitecast Industrial Est., Ballytrasna Little Island
Extension to the existing Aislinn unit at the North of thier site at Little Island Business Park, to accommodate a new Laboratory at ground floor and associated offices at first floor along with all associated site works
Little Island Business Park Ballytrasna Little Island Co. Cork
(1) The demolition of the existing Emerald and Inis Buildings. (2) the construction of a two storey research and development facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to rear at first floor level, storage areas, link at ground and first floor level to the existing research and development facility. (3) the existing canopy walkway to the rear of the O’Neill’s building to be demolished. (4) The retention of the existing lay-by. (5) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match existing with sliding gates and pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (6) The construction of a new service yard and associated vehicular entrance to the east of the building, waste compound and gas bottle storage area. (7) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels. (8) the installation of a new bicycle stand, new road crossings a revised parking layout to the east of O’Neill’s Building and all associated site works.
Little Island Business Park Ballytrasna Little Island Co. Cork
The construction of a new two storey filling hall extension and all associated site works at the plant.
Little Island Business Park Ballytrasna Little Island Co. Cork
The construction of extensions to the R&D Facilities including a two story office and circulation space with entrance canopy extension to the front (South) of the building, a new entrance, stairwell and meeting room at the East side of the building, new first floor toilets and a new utility building to the North side of the building, a new stairwell to the West of the building, new palisade fencing along South and East of the site and all associated site works at the plant.
Little Island Business Park Ballytrasna Little Island Co. Cork
(1) the demolition of the existing Emerald and Inis Buildings and canopy walkway to the rear O’Neill’s Building (2) the construction of a two storey Research & Development Facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to the rear at first floor level, storage areas, link at ground and first floor level to the existing Research & Development Facility. (3) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match exiting with sliding gates & pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (4) The construction of a new service yard & associated vehicular entrance to the east of the building, waste compound & gas botte storage area (5) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels (6) The installation of a bicycle stand, two new road-crossings and a revised parking layout to the east of O’Neill Building and all associated site works. (7) and are also applying for permission for retention of existing roadside lay-by. All at their plant at Little Island Business Park.
Little Island Business Park Ballytrasna Little Island Co. Cork