Proposed Development
The demolition of a derelict building and all associated site works to be carried out within the curtilage of a Recorded Protected Structure, ID Number 00618, namely School (former Church of Ireland school), in the townland of Brinny.
Application Timeline
Application received
8 Apr 2020
Decision: CONDITIONAL
21 Oct 2020
Decision due
2 Nov 2020
Grant issued
24 Nov 2020
Application Details
- Location
- Brinny Innishannon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 April 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 October 2020
- Grant Date
- 24 November 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Two storey dwelling, wastewater treatment plant and ancillary works. (Within the Curtilage of Protected Structure RPS No.00615 and Recorded Archaeological Monument)
Brinny Mills Brinny Innishannon Co. Cork
The replacement to the south of the site of the existing site security fencing to the perimeter of the site with a new 2.43 metre high fence, the replacement of the existing vehicular entrance gate with new vehicular entrance gate and the provision of a new turnstile and pedestrian gate. The application relates to development which is for the purpose of an activity which holds an Industrial Emissions Directive License.
Brinny Innishannon Co. Cork
A Combined Heat & Power Plant comprising of an 8m high 178sqm single storey building to house the boiler equipment, a gas turbine enclosed in an acoustic unit located adjacent to the building, a water tank with a max height of 7m, a piperack from the new CHP plant to the existing boilerhouse, a 15m high stack 1.2m in diameter, 7m of which will be visible above the boiler building ridge level
Brinny
Construction of combined heat and power plant (CHP) comprising of 8m high single storey building to house boiler equipment, gas tubine enclosed in an acoustic unit located adjacent to the building, a water tank with max. height of 7m, a pipe rack from the new CHP plant to the existing boilerhouse, a 15m high stack, 1.2m in diameter, 7m of which will be visible above the boiler building ridge level
Brinny Innishannon
(a)Erection of four 250m3 (13metres high) storage tanks in the area of the existing waste water treatment facility, involving the demolition of two existing redundant shed buildings. (b)Removal/demolition of two existing redundant waste water treatment tanks and the construction of a decanter, control and plant room building of 211m2 (7.5 meters high) in the area of the existing waste water treatment facility, above a redundant bund that will become a basement space designated for future use as a plant room. (c)The construction of a 6.25m2 (3.3 metres high) storm water monitoring building, at the southern end of the facility. Associated site works will consist of paths and landscaping
Brinny Innishannon
Permission for a) Single storey extension with external mechanical plant platform (above roof of extension) to building 22, b) Elevational modifications to building 22, c) Associated site development works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
MSD Brinny Innishannon Co. Cork
Permission for (A) Single storey extension to existing laboratory building (Building 22) with external mechanical plant platform (above roof of extension). (B) Elevational modifications to building 22 and associated site works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
Brinny, Innishannon, Co. Cork, T12 RD82
Works to existing Building 22 fermentation building previous Pl. Reg. No. S/93/0464: (A) Elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associated paths and landscaping, (B) Retention of the existing extension to the south east corner of the building on the ground and first floors
Brinny Innishannon Co. Cork
A 50sqm single storey extension to building 22, which will be used for the purposes of gowning, staging and entry into an existing laboratory, including all associated modifications and site development works. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required.
Brinny Innishannon Co. Cork
Works to existing building 22 fermentation building previously granted permission under Planning Reg. No. S/93/464 consisting of:[a] elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associted paths and landscaping, and [b] retention of existing extension to the south east corner of the building on the ground and first floors
Brinny Innishannon