← Back to search

IDA Industrial Estate Barnagore Ovens Co. Cork

CONDITIONAL

Planning application 20/5198

Cork - Cork County Council

Proposed Development

The development will comprise of a single-storey extension to an existing electrical MV switch room building of approx. 25sqm; modifications to the existing electrical switch room building that are required to accommodate the proposed extension; and all associated site-development works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jun 2020

  2. Decision: CONDITIONAL

    28 Jul 2020

  3. Decision due

    6 Aug 2020

  4. Grant issued

    31 Aug 2020

Application Details

Location
IDA Industrial Estate Barnagore Ovens Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
12 June 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 July 2020
Grant Date
31 August 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
03/5111CONDITIONAL14 Oct 2003

See application for details

BARNAGORE, BARNAGORE,

106m
05/5380CONDITIONAL27 Jul 2005

Extensions to dwelling

21, Beverly Grange Ovens

125m
14/6757CONDITIONAL19 Dec 2014

Planning permission for a new office building and data centre within the existing facility. The proposed development includes the construction of a 4 storey office building with an elevated atrium, a screened roof top plant area and roof top satellite dishes; a single storey data centre building with rooftop plant/air handling units; a 4 storey multi-storey car park with bicycle storage, dry room and staff locker rooms; the addition of a single storey deck to an existing car park; and all associated landscaping, fencing, signage and site development works. The proposed site development works include the relocation and replacement of the existing water tank and associated pumping station; the construction of 2 no. substations, an extension to and the re-cladding of the existing chiller block; an extension to and the re-cladding of the existing energy centre; the erection of a boiler flue; the installation of a pumping station and 8 no. generator units with 4 no. ancillary fuel tanks. Access to the proposed buildings will be via the existing access road and the proposed development includes modifications to the existing entrance arrangements. The proposed office building will be constructed in 2 phases over the period of the permission.

IDA Industrial Estate Barnagore Ovens

128m
23/6192CONDITIONAL31 Oct 2023

Permission for the construction of a 300-kilowatt ground-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of existing hard-standing to the east of the main building on site. The array will have a maximum height of 3 metres above the existing ground level.

Barnagore Ovens Co. Cork

206m
12/6584CONDITIONAL19 Dec 2012

New bus stop and shelter with widened concrete footpaths and associated civil & drainage works, a new personnel turnstile entrance and construction of an extension to the existing wall, underground ducting to provide power to the turnstile and lighting for the shelter, and new road markings

IDA Industrial Estate Barnagore Ovens Co.Cork

211m
26/0331Awaiting F.I. Response13 Feb 2026

The construction of a two-megawatt ballast-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of grassland to the east of the main building on site. The array will have a maximum height of three metres above existing ground level, at the townland of Barnagore, Ovens, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Barnagore, Ovens, County Cork, P31 D253

214m
12/6226INCOMPLETED APPLICATION25 Oct 2012

Construction of a new bus stop and shelter with widened concrete footpaths and associated civil and drainage works, a new personnel turnstile entrance, underground ducting to provide power for lighting for the shelter, and new road markings

IDA Industrial Estate Barnagore Ovens Co. Cork

225m
11/4426CONDITIONAL4 Mar 2011

Construction of first floor gable extension to dwellinghouse to include extension to 2 no. bedrooms, 2 no. en-suites and 1 no. walk-in wardrobe

11 Beverly Grange Ovens

225m
11/4263INCOMPLETED APPLICATION11 Feb 2011

First Floor gable extension to extend 2 no. bedrooms and add 2 no. ensuites and 1 no. walk-in wardrobe

No.11 Beverly, Grange Ovens Co Cork

253m
23/4276REFUSED17 Feb 2023

Construction of a new two storey dwelling house with veranda, storage shed for domestic use and ancillary to the applicant's gardening business, and associated site development works.

Barnagore Ovens Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?