Proposed Development
The development will comprise of a single-storey extension to an existing electrical MV switch room building of approx. 25sqm; modifications to the existing electrical switch room building that are required to accommodate the proposed extension; and all associated site-development works.
View the full application file on the council's planning portal →Application Timeline
Application received
12 Jun 2020
Decision: CONDITIONAL
28 Jul 2020
Decision due
6 Aug 2020
Grant issued
31 Aug 2020
Application Details
- Location
- IDA Industrial Estate Barnagore Ovens Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 June 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 July 2020
- Grant Date
- 31 August 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
See application for details
BARNAGORE, BARNAGORE,
Extensions to dwelling
21, Beverly Grange Ovens
Planning permission for a new office building and data centre within the existing facility. The proposed development includes the construction of a 4 storey office building with an elevated atrium, a screened roof top plant area and roof top satellite dishes; a single storey data centre building with rooftop plant/air handling units; a 4 storey multi-storey car park with bicycle storage, dry room and staff locker rooms; the addition of a single storey deck to an existing car park; and all associated landscaping, fencing, signage and site development works. The proposed site development works include the relocation and replacement of the existing water tank and associated pumping station; the construction of 2 no. substations, an extension to and the re-cladding of the existing chiller block; an extension to and the re-cladding of the existing energy centre; the erection of a boiler flue; the installation of a pumping station and 8 no. generator units with 4 no. ancillary fuel tanks. Access to the proposed buildings will be via the existing access road and the proposed development includes modifications to the existing entrance arrangements. The proposed office building will be constructed in 2 phases over the period of the permission.
IDA Industrial Estate Barnagore Ovens
Permission for the construction of a 300-kilowatt ground-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of existing hard-standing to the east of the main building on site. The array will have a maximum height of 3 metres above the existing ground level.
Barnagore Ovens Co. Cork
New bus stop and shelter with widened concrete footpaths and associated civil & drainage works, a new personnel turnstile entrance and construction of an extension to the existing wall, underground ducting to provide power to the turnstile and lighting for the shelter, and new road markings
IDA Industrial Estate Barnagore Ovens Co.Cork
The construction of a two-megawatt ballast-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of grassland to the east of the main building on site. The array will have a maximum height of three metres above existing ground level, at the townland of Barnagore, Ovens, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Barnagore, Ovens, County Cork, P31 D253
Construction of a new bus stop and shelter with widened concrete footpaths and associated civil and drainage works, a new personnel turnstile entrance, underground ducting to provide power for lighting for the shelter, and new road markings
IDA Industrial Estate Barnagore Ovens Co. Cork
Construction of first floor gable extension to dwellinghouse to include extension to 2 no. bedrooms, 2 no. en-suites and 1 no. walk-in wardrobe
11 Beverly Grange Ovens
First Floor gable extension to extend 2 no. bedrooms and add 2 no. ensuites and 1 no. walk-in wardrobe
No.11 Beverly, Grange Ovens Co Cork
Construction of a new two storey dwelling house with veranda, storage shed for domestic use and ancillary to the applicant's gardening business, and associated site development works.
Barnagore Ovens Co.Cork