Barnagore, Ovens, County Cork, P31 D253
Awaiting F.I. ResponsePlanning application 26/0331
Cork - Cork County Council
Proposed Development
The construction of a two-megawatt ballast-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of grassland to the east of the main building on site. The array will have a maximum height of three metres above existing ground level, at the townland of Barnagore, Ovens, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
View the full application file on the council's planning portal →Application Details
- Location
- Barnagore, Ovens, County Cork, P31 D253
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 February 2026
- Status
- Awaiting F.I. Response
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the construction of a 300-kilowatt ground-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of existing hard-standing to the east of the main building on site. The array will have a maximum height of 3 metres above the existing ground level.
Barnagore Ovens Co. Cork
Planning permission for a new office building and data centre within the existing facility. The proposed development includes the construction of a 4 storey office building with an elevated atrium, a screened roof top plant area and roof top satellite dishes; a single storey data centre building with rooftop plant/air handling units; a 4 storey multi-storey car park with bicycle storage, dry room and staff locker rooms; the addition of a single storey deck to an existing car park; and all associated landscaping, fencing, signage and site development works. The proposed site development works include the relocation and replacement of the existing water tank and associated pumping station; the construction of 2 no. substations, an extension to and the re-cladding of the existing chiller block; an extension to and the re-cladding of the existing energy centre; the erection of a boiler flue; the installation of a pumping station and 8 no. generator units with 4 no. ancillary fuel tanks. Access to the proposed buildings will be via the existing access road and the proposed development includes modifications to the existing entrance arrangements. The proposed office building will be constructed in 2 phases over the period of the permission.
IDA Industrial Estate Barnagore Ovens
New bus stop and shelter with widened concrete footpaths and associated civil & drainage works, a new personnel turnstile entrance and construction of an extension to the existing wall, underground ducting to provide power to the turnstile and lighting for the shelter, and new road markings
IDA Industrial Estate Barnagore Ovens Co.Cork
Construction of a new bus stop and shelter with widened concrete footpaths and associated civil and drainage works, a new personnel turnstile entrance, underground ducting to provide power for lighting for the shelter, and new road markings
IDA Industrial Estate Barnagore Ovens Co. Cork
The construction of 25 No. dwellinghouses (change of plan of house No's 12 to 20 Codrum Lane , No's 14 to 31 Codrum Green). The proposed changes to above comprise of: a) The construction of 8 No. semi detached dwellings - denoted house no's 12-19 Codrum Lane, b) The construction of 16 No. semi detached and 1 No. detached dwellings - denoted house No's 14 to 30 Codrum Green, c) and all associated site works. The proposed development is a change plan from that originally permitted under Cork County Council Planning Ref : 06/12722 & ABP ref. PL 04.224953 and extended under ref 13/4725, 18/4980, 21/7517. This application will result in the re-designation of house address as outlined on the proposed site layout, there is an overall reduction of 2 dwelling units proposed as part of this planning application.
Codrum Hall Grange Ovens Co.Cork
The development will comprise of a single-storey extension to an existing electrical MV switch room building of approx. 25sqm; modifications to the existing electrical switch room building that are required to accommodate the proposed extension; and all associated site-development works.
IDA Industrial Estate Barnagore Ovens Co. Cork
Copnstruction of storage building for long term storage of furniture
Barnagore Ballincollig Ovens
Demolition of front porch and back annex and extension to rear
Barnagore Ovens
Demolition of front porch and back annex, construction of extension to rear and installation of waste water treatment unit to serve 2 no. dwellinghouses
Barnagore Ballincollig
Dwellinghouse and installation of proprietary treatment unit
Barnagore Ovens
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?