Ballintaggart Ringaskiddy Co. Cork

CONDITIONAL

Planning application 20/5533

Cork - Cork County Council

Proposed Development

A 10 year planning permission for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works. The proposed compound will be built in the area previously occupied by the ADM waste water treatment plant, which is currently being demolished, Planning Ref. 18/6631 relates to this demolition. Part of the aeration basin tank walls which were to be demolished under Planning Ref. 18/6631 will now be retained as part of this proposed development. Enabling works will include the demolition of the former ADM workshop and stores (total floor area = 820m2 with an overall height of 8.12m): Demolition of this building was previously permitted as part of the expired planning application 12/5768, the relocation and grading of site – won material, the removal of 91 trees, protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposed development will include: A two-storey canteen and meeting rooms building (total floor area = 337m2 with an overall height of 6.45m); a toilet and shower building (total floor area = 202m2 with an overall height of 3.15m); an electrical sub-station ( total floor area = 56m2 with an overall height of 3.15m); a pickling shed (total floor area = 92m2 with an overall height of 4.74m); double-stacked temporary portable contractor cabin (total floor area = 808m2 with an overall height of 4.95m); steel gantry walkways and stairs: a workshop and storage containers area (total floor area = 1290m2 with an overall height of 2.45m); a waste and recycling area for accommodating skips; a laydown area; a new security building (total floor area = 66m2 with an overall height of 3.15m); new internal roads, footpaths and set-down area, relocation of existing car parking spaces and provision of an additional 20 parking spaces, new car park information sign board at the site entrance. The development will include all associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Jul 2020

  2. Decision: CONDITIONAL

    4 Dec 2020

  3. Decision due

    9 Dec 2020

  4. Grant issued

    15 Jan 2021

Application Details

Location
Ballintaggart Ringaskiddy Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 July 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 December 2020
Grant Date
15 January 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

74m
21/5132CONDITIONAL28 Apr 2021

A 10 year permission for the construction of a new Clinical Manufacturing Facility (referred to as RCMF) at the existing Pfizer site. The proposed RCMF facility will include (i) a new five storey clinical manufacturing building (c.11,468sqm and maximum height 29.425m) which will include production areas, laboratories, ancillary office space, warehouse, and plant and utility space. The building will be constructed in two sequential phases, Phase 1 comprising c.9,465 sqm and Phase 2 comprising c.2,003sqm; (ii) a single storey warehouse drum store building (c.420sqm and maximum height 13.00m); (iii) an external utility yard comprising; a two storey electrical building (c.94sqm and maximum height 11.70m), an emergency generator with flue stack, 1No. liquid nitrogen tank, 2No. evaporators, 3No. bunded chillers, 2No. bunded receiver tanks, 2No. bunded glycol tanks, a three storey steel frame structure (to a maximum height of 12.91m) to accommodate; dry coolers, heat exchangers and other miscellaneous utility plant and machinery above the utility yard; (iv) an elevated structural steel piperack (c.210m in length and maximum height 9.19m) to provide piped utility services to the new facility, and; (v) all associated site development works, including roads, paths, yards, underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (P0013-04). As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.

The existing Pfizer site in Ballintaggart and Ballybricken Ringaskiddy Co. Cork

74m
23/5875CONDITIONAL15 Sept 2023

Permission for the construction of a guardhouse building and associated works, including; canopy, ramp, concrete plaza, local internal access road widening, fencing, external lighting, drainage and footpaths. An existing permitted storage shed will also be kept on site indefinitely (currently subject to permission to demolish as part of planning reference 20/5533). The proposed development is covered by an Industrial Emissions Directive Licence no. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accidents Regulations will be submitted with the application

Ballintaggart & Ballybricken Ringaskiddy Co.Cork

77m
06/8086CONDITIONAL14 Jun 2006

Erection of 2.4m high security fencing and low level barriers to parts of boundary

API Plant Ballintaggart Ballybricken Ringaskiddy

135m
23/6129CONDITIONAL20 Oct 2023

Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Ballintaggart Ringaskiddy Co Cork

156m
13/5400CONDITIONAL19 Jul 2013

Construction of an electrical substation building.

Ballintaggart Shanbally

156m
14/5337CONDITIONAL23 Jun 2014

Construction of temporary office accommodation with link corridor to existing building and relocation of existing fence.

Ballintaggart Shanbally Co.Cork

157m
15/6909CONDITIONAL21 Dec 2015

The construction of a 4 storey extension to the north east corner of the existing manufacturing building. The works will also include associated site development works, including internal road realignment and demolition of an existing stair core.

Ballintaggart Shanbally Ringaskiddy Co. Cork

157m
15/5727INCOMPLETED APPLICATION4 Aug 2015

Construction of a New Administration Headblock Building and Atrium, a South Expansion to the existing Laboratory/Administration Building, a Warehouse Building extension and a car park. The works will also include associated site development works, including internal road realignment and the provision of new fencing, gate and barriers, and the demolition of an existing guard house and an existing staircore. (The development is covered by an existing Industrial Emissions Licence No. P0864-01)

Ballintaggart Shanbally Ringaskiddy

157m
15/5818CONDITIONAL17 Aug 2015

Extension to existing manufacturing building consisting of: (1) Extension with atrium for office/administrative use to part of western and to southern elevation, (2) 3 no. separate extensions on western and southern elevations of warehouse area of building for lobby use, airlock area and general warehouse use and associated site development works including car park, internal road realignment and the provision of new fencing, gate and barriers and the demolition of an existing security building (guard house) and existing staircase area to southern elevation of main building.

Ballintaggart Townland Shanbally Ringaskiddy Co. Cork

158m
21/5402CONDITIONAL21 May 2021

1) The construction of an electrical building, 2) i) amendments to the footprint and elevations of the recently permitted water treatment and electrical building which was granted planning under Planning Ref. 20/05207, ii) the construction of a first floor electrical room extension to this permitted water treatment and electrical building. The proposed development is covered by an existing Industrial Pollution Control License No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.

Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork