Ballintaggart & Ballybricken Ringaskiddy Co.Cork
CONDITIONALPlanning application 23/5875
Cork - Cork County Council
Proposed Development
Permission for the construction of a guardhouse building and associated works, including; canopy, ramp, concrete plaza, local internal access road widening, fencing, external lighting, drainage and footpaths. An existing permitted storage shed will also be kept on site indefinitely (currently subject to permission to demolish as part of planning reference 20/5533). The proposed development is covered by an Industrial Emissions Directive Licence no. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accidents Regulations will be submitted with the application
View the full application file on the council's planning portal →Application Timeline
Application received
15 Sept 2023
Decision due
9 Nov 2023
Decision: CONDITIONAL
9 Nov 2023
Grant issued
14 Dec 2023
Application Details
- Location
- Ballintaggart & Ballybricken Ringaskiddy Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 15 September 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 November 2023
- Grant Date
- 14 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A 10 year planning permission for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works. The proposed compound will be built in the area previously occupied by the ADM waste water treatment plant, which is currently being demolished, Planning Ref. 18/6631 relates to this demolition. Part of the aeration basin tank walls which were to be demolished under Planning Ref. 18/6631 will now be retained as part of this proposed development. Enabling works will include the demolition of the former ADM workshop and stores (total floor area = 820m2 with an overall height of 8.12m): Demolition of this building was previously permitted as part of the expired planning application 12/5768, the relocation and grading of site – won material, the removal of 91 trees, protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposed development will include: A two-storey canteen and meeting rooms building (total floor area = 337m2 with an overall height of 6.45m); a toilet and shower building (total floor area = 202m2 with an overall height of 3.15m); an electrical sub-station ( total floor area = 56m2 with an overall height of 3.15m); a pickling shed (total floor area = 92m2 with an overall height of 4.74m); double-stacked temporary portable contractor cabin (total floor area = 808m2 with an overall height of 4.95m); steel gantry walkways and stairs: a workshop and storage containers area (total floor area = 1290m2 with an overall height of 2.45m); a waste and recycling area for accommodating skips; a laydown area; a new security building (total floor area = 66m2 with an overall height of 3.15m); new internal roads, footpaths and set-down area, relocation of existing car parking spaces and provision of an additional 20 parking spaces, new car park information sign board at the site entrance. The development will include all associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.
Ballintaggart Ringaskiddy Co. Cork
Works will include the construction of a new 2 storey L-shaped building to the east of the existing Manufacturing Building. The new building will be connected to the existing Manufacturing Building via a new link corridor and will comprise of storage areas, engineering workshop and parts storage with limited office and sanitary accommodation. The works will also include associated site development works, including underground service modifications, provision of new internal yard are and fencing, internal car park construction and the demolition of 122sq.m of single storey temporary office accommodation. The proposed development is covered by an existing Industrial Emissions License No. P08640-01.
Ballintaggart Shanbally Ringaskiddy Co. Cork
Erection of 2.4m high security fencing and low level barriers to parts of boundary
API Plant Ballintaggart Ballybricken Ringaskiddy
Construction of Monoclonal Antibodies, Small Scale biotechnology facility comprising of three storey manufacturing building with penthouse plant room on third floor level, two storey administration/laboratory wing and warehouse wing, external utilities yard to west of facility, a detached station/guard house , internal ring road, upgrading of existing car park to provide 187 no. staff car parking spaces, provision for 14 no. visitor car parking spaces, landscaping, palisade fencing to site perimeter and decorative fence to South building facade ,signage , sewage treatment unit and all associated site works and services
Ballintaggart
Construction of an electrical substation building.
Ballintaggart Shanbally
Construction of temporary office accommodation with link corridor to existing building and relocation of existing fence.
Ballintaggart Shanbally Co.Cork
Extension to existing manufacturing building consisting of: (1) Extension with atrium for office/administrative use to part of western and to southern elevation, (2) 3 no. separate extensions on western and southern elevations of warehouse area of building for lobby use, airlock area and general warehouse use and associated site development works including car park, internal road realignment and the provision of new fencing, gate and barriers and the demolition of an existing security building (guard house) and existing staircase area to southern elevation of main building.
Ballintaggart Townland Shanbally Ringaskiddy Co. Cork
The construction of a 4 storey extension to the north east corner of the existing manufacturing building. The works will also include associated site development works, including internal road realignment and demolition of an existing stair core.
Ballintaggart Shanbally Ringaskiddy Co. Cork
Construction of a New Administration Headblock Building and Atrium, a South Expansion to the existing Laboratory/Administration Building, a Warehouse Building extension and a car park. The works will also include associated site development works, including internal road realignment and the provision of new fencing, gate and barriers, and the demolition of an existing guard house and an existing staircore. (The development is covered by an existing Industrial Emissions Licence No. P0864-01)
Ballintaggart Shanbally Ringaskiddy
Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Ballintaggart Ringaskiddy Co Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?