Proposed Development
The addition of a zinc box internally illuminated wind breaker with MSD logo to the entrance area of building 21 and associated site works along with the installation of a 2.43 metre high fence to the north site boundary of the building to tie into existing site fencing. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency Act 1992 (as amended) is required.
View the full application file on the council's planning portal →Application Timeline
Application received
10 Nov 2021
Decision: CONDITIONAL
10 Jan 2022
Decision due
13 Jan 2022
Grant issued
15 Feb 2022
Application Details
- Location
- Brinny Innishannon Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 10 November 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 January 2022
- Grant Date
- 15 February 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of (a) external goods and passenger lift to first floor and associated part covered compound (72sqm) to serve Operations 1 Building all to be located on the western elevation of the Operations 1 Building, (b) a canopy roof onto an existing drum storage compound (176sqm) located at the northern end of the site
Brinny Innishannon
Retention of alterations to permitted development (Pl. Reg. No. 08/10363) consisting of (1) an increase in the plan area of the previously approved link bridge between the external lift and the Operations 1 building, from 11.2sqm to 22.9sqm.,(2) the addition of full height single skin side cladding in lieu of fencing around the previously approved yard enclosure (72sqm) and the extension of the canopy roof over the yard enclosure to form a weather tight storage building (65.4sqm)
Brinny Innishannon
Construction of single storey steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of steel framed and cladded gas cylinder storage building
Brinny Innishannon
Construction of two storey extension and single storey extension to eastern elevation and two storey extension to Western elevation to OPS 2 Production building
Brinny Innishannon
Extension to fermentor building, to house contingency fermentor, link corridor & a 2 storey extension to utilities bay to service the fermentor
BRINNY, BRINNY,
Extensions to existing Operations 2 building to provide additional production, office and storage accommodation comprising of two storey extension and single storey extension to Eastern elevation and two storey extension to Western elevation
Brinny Innishannon
Demolition of a single storey solvent washroom annex to existing production building and construction of extension to house production plant
Brinny, Innishannon
Construction of phased extensions to existing OPS 2 Production Building comprising of two storey extension to eastern elevation and two storey extension to western elevation
Brinny Innishannon
Construction of 11m high two storey extension over basement to northern elevation of existing Operations 2 building No. 19 to provide further production space within existing pharmaceutical facility
Brinny Innishannon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?