← Back to search

Beaufort Building - Environmental Research Institute, University College Cork Haubowline Road Loughbeg Ringaskiddy, Co. Cork

CONDITIONAL

Planning application 21/7291

Cork - Cork County Council

Proposed Development

The removal of 8 no. car parking spaces permitted under Cork County Council planning application 11/5487, and their replacement with the construction of an open-air outdoor enclosure comprising of a concrete base, timber panel security fence and access gateways, fixed to the existing in-situ concrete wall, and all associated development. The enclosure will house a test rig, consisting of pipe work,3 no. water tanks, and electronic equipment, mounted on a steel framed platform (a skid) to facilitate transport by road and ease of installation and allow for the removal of the rig once testing is complete after approximately 3 years.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Dec 2021

  2. Decision: CONDITIONAL

    9 Feb 2022

  3. Decision due

    11 Feb 2022

  4. Grant issued

    24 Mar 2022

Application Details

Location
Beaufort Building - Environmental Research Institute, University College Cork Haubowline Road Loughbeg Ringaskiddy, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
9 December 2021Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 February 2022
Grant Date
24 March 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

28m
23/5531CONDITIONAL26 Jul 2023

Removal of three car parking spaces and the erection of a research container unit.

Beaufort Building - Environmental Research Institute University College Cork Haulbowline Road Loughbeg Ringaskiddy Co Cork

113m
23/6365CONDITIONAL24 Nov 2023

Permission for the relocation and erection of a small micro generation research wind turbine at the north -eastern corner of the site. The wind turbine will be used to provide power to the Beaufort Building and for the educational purposes. The project involves: 1) construction of a concrete foundation for the turbine (measuring 12.25m2), 2) erection of the tower and turbine (metal lattice tower and turbine with tip height of 19.1m) and 3) associated site works, fencing and utility connections

Beaufort Building - Environmental Research University College Cork, Haulbowline Road Loughbeg, Ringaskiddy Co.Cork

267m
07/10277CONDITIONAL14 Aug 2007

Widening of existing entrance, relocation of existing front road boundary fence, relocation of weighbridge, change of use of building 1 & 2 from bulk storage of granulated fertilizer to accommodate port related activities including storage and screening of wood pellets, timber, feedstuffs and non hazardous fertilizers routed through Port of Cork and open storage of finished product on pallets

Ringaskiddy

267m
07/9758INCOMPLETED APPLICATION20 Jul 2007

Widening of existing entrance, relocation of existing front road boundary fence, relocation of weighbridge, change of use of Building No's 1 & 2 to accommodate port related activities to include storage and screening of wood pellets, timber, feedstuffs and non hazardous fertilizers routed through Port of Cork and open sotrage of finished product on pallets

Ringaskiddy

299m
12/5399WITHDRAWN27 Jun 2012

Change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile cold bitumen recycling mixing equipment

Ringaskiddy Co. Cork .

299m
12/5123INCOMPLETED APPLICATION25 May 2012

For the change of use of existing dis-used loading yard area to use for the open storage of aggregate material for road re-surfacing and use of existing hardcore yard for occasional re-cycling of aggregate material using mobile mixing equipment

Ringaskiddy Co.Cork .

501m
05/4080CONDITIONAL10 Jun 2005

Conversion of industrial storage facility in a former magazine building to crematorium with associated site works

Rocky Island Ringaskiddy

734m
20/4200CONDITIONAL6 Feb 2020

a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.

Loughbeg Ringaskiddy Co. Cork

741m
17/7092CONDITIONAL28 Nov 2017

Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy Co. Cork

746m
10/4078INCOMPLETED APPLICATION20 Jan 2010

Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years

Loughbeg Industrial Estate Loughbeg Ringaskiddy

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?