Proposed Development
The construction of 42 no. dwelling houses, a two storey crèche and all ancillary site development works. The proposed development consists of the construction of 20 no .3 bedroom townhouses and 22 no. 2 bedroom townhouses. The proposed development is a change of plan from that previously permitted by Pl.Ref.No. 19/5749 (as amended by Pl.Ref.No. 21/4026) and will result in the loss of 2 no. residential units from that currently permitted. Provision is made for a previously permitted pedestrian connection to the existing estate to the east. Vehicular access to the proposed development will be provided via the entrance permitted by Pl.Reg.No. 19/5749 from Convent Hill (L-2011) to the north. The proposed internal road network will connect to the permitted development to the west which is accessed via the existing entrance from the Dunmanway Road (R586) to the South.
View the full application file on the council's planning portal →Application Timeline
Application received
27 Apr 2022
Decision: CONDITIONAL
20 Sept 2022
Decision due
21 Sept 2022
Grant issued
27 Oct 2022
Application Details
- Location
- Coolfadda Bandon Co.Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 27 April 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 20 September 2022
- Grant Date
- 27 October 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of 24 no. residential units comprising of 12 no. 2 bedroom duplex/apartment units and 12 no 1 bedroom apartment units to be provided in 6 no. 2-3 storey buildings and all ancillary site development works. Ancillary works include the provision of bicycle and bin stores. The proposed development is a change of plan from that previously permitted by planning reference 19/5749 (as amended by planning reference 21/4026) and will result in an increase of 12 no. residential units from that currently permitted. Vehicular access to the proposed units will be provided via the existing entrance from the Dunmanway Road ( R586) to the south
Coolfadda Bandon Co.Cork
The construction of a residential development of 64 no. residential units, a crèche, and associated site development works. The proposed development consists of the construction of 9 no. 4-bed detached dwelling houses, 26 no. 4-bed semi-detached dwelling houses, 1 no. 3-bed detached dwelling house, 16 no. 3-bed semi-detached/terraced dwelling houses, 6 no. 3-bed and 6 no. 1-bed apartment/duplex units contained in 3 no. 2/3 storey apartment blocks. Vehicular access to site will be via a new entrance from Convent Hill (L-2011) to the north and the entrance permitted under Cork County Council Reference 06/4528 from the Dunmanway Road (R586) to the south. The proposed development also includes 2 no. separate pedestrian access points from the Dunmanway Road connecting into the public footpath network. Infrastructure development works will comprise the diversion and/or undergrounding of 10 kV ESB powerlines, surface water attenuation, wastewater and water utility services. The proposed development also includes open space, landscaping, car parking spaces, bicycle racks, bin stores, public lighting and all ancillary site development works. The proposed development represents a change of plan from that previously permitted under Cork County Council Planning Reference 06/4528 (subsequently extended under references 14/4413 & 18/6604) and minor amendments to the internal road network of permitted Cork County Council Planning Reference 08/7515 (subsequently extended under references 14/4105 & 18/6460).
Coolfadda Bandon Co. Cork
Demolition of 6 no. dwelling houses and outbuildings and the construction of 87 no. dwelling houses comprising 74 no. two, three and four bed terraced dwellings and 13 no. four and five bed detached dwellings with associated parking and landscaping, provision of two-storey creche, vehicular and pedestrian entrances and all assocaited site works, extension of duartion of permission granted under planning reg no. 06/4528
Coolfadda Bandon
Demolition of 6 no. dwellinghouses and outbuildings and construction of 87 no. dwellinghouses comprising of 74 no. two, three and four bed terraced dwellings and 13 no. four and five bed detached dwellings with associated parking and landscaping, provision of two storey creche, vehicular and pedestrian entrances and all associated site works
Coolfadda Bandon
Demolition of 6 no. dwelling houses and outbuildings and the construction of 87 no. dwelling houses comprising 74 no. two, three and four bed terraced dwellings and 13 no. four and five bed detached dwellings with associated parking and landscaping, provision of two-storey creche, vehicular and pedestrian entrances and all associated site works, extension of duration of permission granted under planning reg no. 06/4528 and 14/04413.
Coolfadda Bandon Co. Cork
Demolition of 6 no. dwellinghouses and outbuildings and construction of 87 no. dwellinghouses comprising of 74 no. two, three and four bed terraced dwellings and 13 no. four and five bed detached dwellings, assocated parking and landscaping, two storey creche and all associated site works
Coolfadda Bandon
Demolition of 6 no. dwellinghouses and outbuildings and construction of 87 no. dwellinghouses comprising of 74 no. two, three and four bed terraced dwellings and 13 no. four and five bed detached dwellings with associated parking and landscaping, provision of two storey creche, vehicular and pedestrian entrances and all associated site works, extension of duration to permission granted under planning reg 06/4528
Coolfadda Bandon Co. Cork
Construction of 9 no. dwelling houses consisting of 8 no. 3 bedroom semi-detached dwelling houses and 1 no. 3 bedroom detached dwelling house and all ancillary site development works. The proposed development is a change of plan from that previously permitted under Cork County Council Planning reference 08/7515 [as extended under Cork County Council Planning Reference 14/4105 & 18/6460] and will replace 10 no. permitted dwelling houses. Access to the proposed development will be provided via the junction and internal road network from Convent Hill (L-2011) to the north as permitted under Cork County Council Planning Reference 08/7515 [as extended under Cork County Council Planning References 14/4105 & 18/6460].
Coolfadda Bandon Co. Cork
Demolition of extension to dwelling, installation of proprietary treatment unit and construction of new entrance to serve the existing dwelling, construction of new dwellinghouse and treatment unit and associated works
Coolfadda Bandon
Retention of change of use of part of attic area to living area including 2 no. roof lights to front elevation of dwelling
Upper Convent Hill Coolfadda Bandon Co. Cork