← Back to search

Prochóg Cait Ballynoran Ballyhea Co Cork

INCOMPLETED APPLICATION

Planning application 23/6533

Cork - Cork County Council

Proposed Development

Permission to construct a barbican wooden foot bridge entrance to a holiday home and garden shed. Landscaped fruit bushes, vegetable garden and a hawe, apple and plum tree boundary with low environment impact.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2023

  2. Decision due

    21 Feb 2024

Application Details

Location
Prochóg Cait Ballynoran Ballyhea Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
19 December 2023Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
21 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
19/6333REFUSED25 Sept 2019

To construct a dwelling and all associated site works.

Ballynoran Td. Ballyhea Co. Cork

33m
25/4091REFUSED28 Jan 2025

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works

Ballynoran Ballyhea Co.Cork

36m
25/5868Application Withdrawn10 Sept 2025

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works.

Ballynoran, Ballyhea, Co. Cork

107m
17/4460CONDITIONAL1 Mar 2017

Retention of extension and alterations to existing cottage and all associated site works-This application involves a protected/listed structure.

Ballynoran Ballyhea Co.Cork

165m
03/2546CONDITIONAL28 May 2003

Bungalow

BALLYNORAN, BALLYNORAN,

279m
23/6099CONDITIONAL17 Oct 2023

The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.

Fiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork

378m
05/471CONDITIONAL1 Feb 2005

Garage

Ballynoran Ballyhea

379m
15/4171WITHDRAWN2 Feb 2015

The removal of condition no. 20 of planning permission granted under planning reference number 14/4817. This condition is in relation to maintenance of hedging and grass margin on the opposite roadside boundary to proposed vehicular entrance

Ballynoran Ballyhea Charleville, Co Cork

385m
14/4817CONDITIONAL23 Apr 2014

Construction of dwellinghouse, alterations to existing entrance of adjoining to form double entrance, waste water treatment system and all associated site works

Ballynoran Ballyhea Charleville

385m
14/4708INCOMPLETED APPLICATION8 Apr 2014

Construction of dwelling house, waste water treatment system and all associated site works

Ballynoran Ballyhea Charleville

The submission window has closed

Observations on this application closed on Wednesday 31 January 2024, five weeks after it was received. The authority cannot accept a late submission.