Proposed Development

Permission for construction of a single 4.3MW wind turbine generator (WTG) at their facility. This application will be inclusive of the turbine, underground connection to new on-site electrical building and all associated infrastructure. Proposed project will contribute towards decarbonizing the Hovione facility by using energy from WTG to power on-site operations. This facility operates under an Industrial Emissions Licence. Permission is accompanied with both an Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Jul 2024

  2. Decision due

    2 Sept 2024

Application Details

Location
Hovione Ltd Ringaskiddy Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
9 July 2024Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
2 September 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

247m
13/6262CONDITIONAL29 Nov 2013

The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility

Loughbeg Ringaskiddy

370m
11/6527CONDITIONAL2 Dec 2011

Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy .

370m
11/6483INCOMPLETED APPLICATION25 Nov 2011

Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas

Loughhbeg Ringaskiddy Co. Cork

374m
23/4846CONDITIONAL28 Apr 2023

Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.

Loughbeg Ringaskiddy Co Cork

393m
14/4476REFUSED7 Mar 2014

Change of use of building A from a light industrial use to a waste transfer station on a site of c. 2.086ha (c. 5.15 acres). The proposed development comprises drainage works including grit trap, full retention oil interceptor, fire water retention area, and rainwater harvesting tanks, new concrete slab, weighbridge, elevational alterations, external odour control unit with 20m high stack, vehicle parking, vehicle workshop and all site development works. The site is served by the existing access to Ringport Business Park from Loughbeg Road. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.

Building A, Ringport Business Park Loughbeg Ringaskiddy, Co Cork

415m
20/4200CONDITIONAL6 Feb 2020

a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.

Loughbeg Ringaskiddy Co. Cork

486m
18/7056CONDITIONAL22 Nov 2018

Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.

Loughbeg Ringaskiddy Co. Cork

509m
08/8235INCOMPLETED APPLICATION1 Aug 2008

New entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing,signage, lighting and landscaping

Loughbeg Ringaskiddy

509m
08/8507WITHDRAWN21 Aug 2008

Provision of new graded entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing, signage, lighting and landscaping for use for open storage of finished products and building materials

Loughbeg Ringaskiddy

546m
17/7092CONDITIONAL28 Nov 2017

Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas

Loughbeg Ringaskiddy Co. Cork

The submission window has closed

Observations on this application closed on Monday 12 August 2024, five weeks after it was received. The authority cannot accept a late submission.