Hovione Ltd Loughbeg Ringaskiddy Co. Cork
INCOMPLETED APPLICATIONPlanning application 24/5719
Cork - Cork County Council
Proposed Development
Permission for the construction of a single 4.3MW wind turbine, inclusive of underground connection to new on-site electrical building, and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions Licence. Hovione is notified as a Lower Tier Establishment under the Major Accident’s Directive (as enacted by S.I. 209 of 2015). A Natura Impact Statement and Environmental Impact Assessment Report will be submitted to the planning authority with the application.
Application Timeline
Application received
11 Sept 2024
Decision due
5 Nov 2024
Application Details
- Location
- Hovione Ltd Loughbeg Ringaskiddy Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 September 2024Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 5 November 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility
Loughbeg Ringaskiddy
Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy .
Construction of a 222sq metre single storey extension to the existing open roofed waste storage compound to the north west (Planning Reg. No. 01/4145) of the existing manufacturing facility increasing the total area for the compound to 422 sq metres. The above facility is ancillary to the existing production and plant areas
Loughhbeg Ringaskiddy Co. Cork
Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.
Loughbeg Ringaskiddy Co Cork
Change of use of building A from a light industrial use to a waste transfer station on a site of c. 2.086ha (c. 5.15 acres). The proposed development comprises drainage works including grit trap, full retention oil interceptor, fire water retention area, and rainwater harvesting tanks, new concrete slab, weighbridge, elevational alterations, external odour control unit with 20m high stack, vehicle parking, vehicle workshop and all site development works. The site is served by the existing access to Ringport Business Park from Loughbeg Road. An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application.
Building A, Ringport Business Park Loughbeg Ringaskiddy, Co Cork
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.
Loughbeg Ringaskiddy Co. Cork
New entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing,signage, lighting and landscaping
Loughbeg Ringaskiddy
Provision of new graded entrance from public road, the regrading, hardcoring and blinding of the site and the provision of surface water drainage, low level retaining walls, boundary fencing, signage, lighting and landscaping for use for open storage of finished products and building materials
Loughbeg Ringaskiddy
Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy Co. Cork
The submission window has closed
Observations on this application closed on Tuesday 15 October 2024, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?