Coolcaum Churchtown Mallow Co Cork
INCOMPLETED APPLICATIONPlanning application 24/6428
Cork - Cork County Council
Proposed Development
Permission for:-
- a)Construction of a single storey extension to the side of existing dwelling house
- b)Demolition of existing entrance porch
- c)Demolition of existing chimney
- d)Removal of existing septic tank
- e)Installation of new septic tank and associated percolation area
- f)Construction of new vehicular entrance
- g)All associated site works.
Application Timeline
Application received
17 Dec 2024
Decision due
19 Feb 2025
Application Details
- Location
- Coolcaum Churchtown Mallow Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 17 December 2024Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 19 February 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for: a) Construction of single storey extension to the side of existing dwelling house. b) Demolition of existing entrance porch. c) Demolition of existing chimney. d) Removal of existing septic tank. e) Installation of new septic tank and associated percolation area. f) Construction of new vehicular entrance. g) All associated site works.
Coolcaum Churchtown Mallow Co.Cork
Single storey dwelling, garage and installation of septic tank
Coolcaum Churchtown Mallow
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Coolcaum Churchtown Mallow Co.Cork
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Coolcaum Churchtown Mallow Co. Cork
Construction of waste water treatment storage tank, livestock unit to include cubicles, slatted area, slatted slurry storage tanks, feeding passage and collection yard
Annagh South Churchtown Mallow
Construction of overground slurry tank, slatted reception tank and slatted emptying tank
Annagh South Churchtown Mallow
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.
The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this application.
Fiddane, Cooliney, Ballynoran, Coolcaum Ballyroe, Charleville Co. Cork
To fit two velux roof windows to front roof of existing dwellinghouse, construction of domestic garage/store, hay and straw store and workshop
Coolcaum Churchtown Co. Cork
Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site works
Coolcaum Churchtown Mallow Co.Cork
The submission window has closed
Observations on this application closed on Wednesday 29 January 2025, five weeks after it was received. The authority cannot accept a late submission.