Application Timeline

  1. Application received

    29 Jan 2008

  2. Decision due

    19 Jun 2008

  3. Decision: CONDITIONAL

    19 Jun 2008

  4. Grant issued

    22 Jul 2008

Application Details

Location
Coolcaum Churchtown Mallow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
29 January 2008Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 June 2008
Grant Date
22 July 2008

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

50m
25/4063CONDITIONAL21 Jan 2025

Permission for: a) Construction of single storey extension to the side of existing dwelling house. b) Demolition of existing entrance porch. c) Demolition of existing chimney. d) Removal of existing septic tank. e) Installation of new septic tank and associated percolation area. f) Construction of new vehicular entrance. g) All associated site works.

Coolcaum Churchtown Mallow Co.Cork

50m
24/6428INCOMPLETED APPLICATION17 Dec 2024

Permission for:- a) Construction of a single storey extension to the side of existing dwelling house, b) Demolition of existing entrance porch, c) Demolition of existing chimney, d) Removal of existing septic tank, e) Installation of new septic tank and associated percolation area, f) Construction of new vehicular entrance and g) All associated site works.

Coolcaum Churchtown Mallow Co Cork

491m
22/5681CONDITIONAL18 Jul 2022

A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.

Coolcaum Churchtown Mallow Co.Cork

491m
22/5460INCOMPLETED APPLICATION21 Jun 2022

A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.

Coolcaum Churchtown Mallow Co. Cork

906m
07/4536CONDITIONAL29 Jan 2007

Construction of waste water treatment storage tank, livestock unit to include cubicles, slatted area, slatted slurry storage tanks, feeding passage and collection yard

Annagh South Churchtown Mallow

909m
07/8891CONDITIONAL21 Jun 2007

Construction of overground slurry tank, slatted reception tank and slatted emptying tank

Annagh South Churchtown Mallow

1.0km
22/5933Conditional Permission13 Sept 2022

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.

The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.

1.0km
22/5777INCOMPLETED APPLICATION28 Jul 2022

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. Ref. 17/05799 & ABP-308846-20) to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe Solar Farm (Pl. Ref. 20/04041), Co. Cork. The cables will be under public road and private lands. A Natura Impact Statement will be submitted to the Planning Authority with this application.

Fiddane, Cooliney, Ballynoran, Coolcaum Ballyroe, Charleville Co. Cork

1.0km
07/6511CONDITIONAL28 Mar 2007

Construction of slatted tank and extension to existing milking parlour

Caherconnor Churchtown Mallow

1.1km
16/6832REFUSED14 Nov 2016

To fit two velux roof windows to front roof of existing dwellinghouse, construction of domestic garage/store, hay and straw store and workshop

Coolcaum Churchtown Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?