Loughbeg Ringaskiddy Co. Cork
INCOMPLETED APPLICATIONPlanning application 25/4505
Cork - Cork County Council
Proposed Development
The construction of
- (i)a new three-level extension to the northern elevation of the existing building 02
- (ii)a new five-level extension to the eastern elevation of the existing building 02
- (iii)Roof mounted plant and external plant
- (iv)additional signage together with all associated site development and ancillary works, including local modifications to internal site roads, footpaths and underground drainage utility services. The application relates to a development which comprises an activity requiring an Industrial Emissions Directive Licence. Hovione is notified as a Lower Tier Establishment under the Major Accidents Directive (as enacted by S.I. 209 of 2015).
Application Timeline
Application received
21 Mar 2025
Decision due
15 May 2025
Application Details
- Location
- Loughbeg Ringaskiddy Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 March 2025Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 15 May 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of a new single storey building extension to the west side of existing administration/canteen building together with all associated site works. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence.
Loughbeg Ringaskiddy Co Cork
Planning permission for a weathered enclosure to existing external mechanical equipment and associated site works at the existing facility.
Loughbeg Ringaskiddy Co. Cork
The construction of a security building at the existing entrance road security barrier and a car park with 202 spaces and associated site works for use ancillary to the existing manufacturing facility
Loughbeg Ringaskiddy
Installation of a solar photovoltaic (PV) array on the roof of production facility within a site of 0.32ha. The array will consist of c.1825sq.m of PV modules. The proposed PV array will have a maximum generating capacity of c.300kW.
Loughbeg Ringaskiddy Co. Cork
a) The demolition of a 107 square metre single storey timber framed structure and cladded canopy within the loading bay area to the north of the existing production facility, b) the construction of 1 no. single storey extension within the loading bay area to the north and 1 no. single storey extension to the north west of the existing production facility and c) all associated modifications and site development works.
Loughbeg Ringaskiddy Co. Cork
Construction of a 222 sq metre single storey extension to the existing open roofed waste storage compound to the north west of the existing manufacturing facility permitted under Pl. Reg. No. 01/4145 increasing the total area for the compound to 422sq metres. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy .
Retention of a 240 square meter two storey structure for office use on the east side of the existing manufacturing facility. The above facility is ancillary to the existing production and plant areas
Loughbeg Ringaskiddy Co. Cork
Retention of a 60metre high meteorological data collection mast at Loughbeg. The period of retention in relation to this application is 2 years
Loughbeg Industrial Estate Loughbeg Ringaskiddy
Construction of 2 no. single storey utilities buildings, alterations to elevations of existing maintenance building 105 and extensions to production building 101 including alterations to elevations and associated site works
Currabinny Carrigaline
Single storey extension to existing electrical building 108 including alterations to elevations, construction of first floor electrical room extension on existing waste water treatment facility and associated civil works
Curraghbinny Carrigaline
The submission window has closed
Observations on this application closed on Thursday 24 April 2025, five weeks after it was received. The authority cannot accept a late submission.