← Back to search

Numbers 7 & 8 Lower Quartertown, Quartertown Lower Mallow Co.Cork

Grant with Conditions

Planning application 25/5763

Cork - Cork County Council

Proposed Development

Permission for

  1. 1)
    demolition of the two existing derelict dwellings, numbers 7&8
  2. 2)
    construction of two replacement single storey semi-detached dwellings
  3. 3)
    carrying out all associate site works, including boundary walls and fences
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Sept 2025

  2. Decision: Grant with Conditions

    28 Apr 2026

  3. Decision due

    29 Apr 2026

  4. Grant issued

    3 Jun 2026

Application Details

Location
Numbers 7 & 8 Lower Quartertown, Quartertown Lower Mallow Co.Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
3 September 2025
Status
Application Closed
Decision
Grant with Conditions
Decision Date
28 April 2026
Grant Date
3 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
25/5505INCOMPLETED APPLICATION28 Jul 2025

Permission for the following: 1) Demolition of the two existing derelict dwellings, number 7 & 8. 2) Construction of two replacement single storey semi detached dwellings. 3) Carry out all associated site works, including boundary walls and fences.

Numbers 7 & 8 Lower Quartertown Mallow Co. Cork

20m
16/6814CONDITIONAL11 Nov 2016

Retention of ground floor extension to rear of dwellinghouse

Quartertown Lower Mallow Co. Cork

39m
18/4549CONDITIONAL7 Mar 2018

Change of use of part of the existing residential property into a preschool and all associated site works

Anach Cuain Quartertown Lower Mallow Co. Cork

41m
06/55043CONDITIONAL30 May 2006

alterations and extension existing dwelling

Quartertown Mallow

105m
24/5191Conditional Permission26 Jun 2024

Permission for a mixed use light industrial/warehouse/commercial development comprising of 5 no. light industrial units with ancillary office space. The proposed development will also include associated site development works including but not limited to vehicular access, car parking spaces, footpaths, foul and storm drainage networks, water-mains, public lighting, landscaping and boundary treatment. A Natura Impact Statement will be submitted to the planning authority with the application.

Quartertown Lower Quartertown Industrial Estate Mallow Co. Cork

113m
24/5192INCOMPLETED APPLICATION25 Jun 2024

Outline Permission is sought for the development of 2 no. storage buildings and all associated site works.

Quartertown Industrial Estate Mallow Co. Cork

113m
24/5370WITHDRAWN19 Jul 2024

Outline Permission for the development of 2no. light industrial units with ancillary office space and all associated site works at Quartertown Industrial Estate, Mallow, Co. Cork. These units are intended for light manufacturing, assembly and storage.

Quartertown Industrial Estate Mallow Co. Cork

187m
25/4291CONDITIONAL24 Feb 2025

Permission for the internal change of use of part of existing warehouse (242 sq.m) to offices to be used ancillary to the existing office warehouse use in the building, alterations to elevations consisting of installation of external insulation to external walls of offices on the north, south & west elevations, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site works.

"Former Homa Pumps Building", Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork. P51 XC7K

187m
25/6210Grant with Conditions17 Oct 2025

Permission for the internal change of use of part of ground floor of existing warehouse to offices (325 square metres), construction of additional ancillary offices & showroom at first floor level (253 square metres), all to be used ancillary to the existing office warehouse use in the building, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site works

'Former Homa Pumps building' Quartertown Industrial Estate, Quartertown Industrial Estate, Mallow, Cork, P51XC7K

200m
26/2305Awaiting Admin Validation4 Sept 2026

to relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?