'Former Homa Pumps building' Quartertown Industrial Estate, Quartertown Industrial Estate, Mallow, Cork, P51XC7K

Grant with Conditions

Planning application 25/6210

Cork - Cork County Council

Proposed Development

Permission for the internal change of use of part of ground floor of existing warehouse to offices (325 square metres), construction of additional ancillary offices & showroom at first floor level (253 square metres), all to be used ancillary to the existing office warehouse use in the building, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Oct 2025

  2. Decision due

    11 Dec 2025

  3. Decision: Grant with Conditions

    11 Dec 2025

  4. Grant issued

    6 Feb 2026

Application Details

Location
'Former Homa Pumps building' Quartertown Industrial Estate, Quartertown Industrial Estate, Mallow, Cork, P51XC7K
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
17 October 2025
Status
Application Closed
Decision
Grant with Conditions
Decision Date
11 December 2025
Grant Date
6 February 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
25/4291CONDITIONAL24 Feb 2025

Permission for the internal change of use of part of existing warehouse (242 sq.m) to offices to be used ancillary to the existing office warehouse use in the building, alterations to elevations consisting of installation of external insulation to external walls of offices on the north, south & west elevations, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site works.

"Former Homa Pumps Building", Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork. P51 XC7K

15m
26/2305Awaiting Admin Validation4 Sept 2026

to relocate an existing vehicular entrance ,onto the existing industrial estate road, from the west side of the site to the south side of the site, together with all associated site works

Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork, P51 XC7K

75m
24/5370WITHDRAWN19 Jul 2024

Outline Permission for the development of 2no. light industrial units with ancillary office space and all associated site works at Quartertown Industrial Estate, Mallow, Co. Cork. These units are intended for light manufacturing, assembly and storage.

Quartertown Industrial Estate Mallow Co. Cork

75m
24/5192INCOMPLETED APPLICATION25 Jun 2024

Outline Permission is sought for the development of 2 no. storage buildings and all associated site works.

Quartertown Industrial Estate Mallow Co. Cork

77m
14/5999CONDITIONAL18 Sept 2014

Extension on west side of existing production building and construction of a new detached boiler house at the rear of the production building

Quartertown Industrial Estate Quartertown Lower Mallow Co.Cork

77m
14/5932INCOMPLETED APPLICATION10 Sept 2014

An extension on the west side of the existing production building and the construction of a new detached boiler house at the rear of the production building. The application relates to development which comprises an activity requiring an integrated pollution prevention and control licence.

Quartertown Industrial Estate Quartertown Lower Mallow

85m
14/5404CONDITIONAL2 Jul 2014

Elevation alterations to the North, East and West of existing industrial building (known as the Hi-Cone facility). The alterations include new cladding, new entrance canopy, and 2no. access doors, signage and associated site works

Quartertown Industrial Estate Quartertown Mallow

85m
14/5291INCOMPLETED APPLICATION17 Jun 2014

Elevation alterations to the North, East & West of the existing industrial building (known as the Hi-Cone facility). The alterations include new cladding, new entrance canopy, and 2no. access doors, signage and associated site works

Quartertown Industrial Estate Quartertown Lower Mallow Co.Cork

100m
24/5191Conditional Permission26 Jun 2024

Permission for a mixed use light industrial/warehouse/commercial development comprising of 5 no. light industrial units with ancillary office space. The proposed development will also include associated site development works including but not limited to vehicular access, car parking spaces, footpaths, foul and storm drainage networks, water-mains, public lighting, landscaping and boundary treatment. A Natura Impact Statement will be submitted to the planning authority with the application.

Quartertown Lower Quartertown Industrial Estate Mallow Co. Cork

110m
06/55039NEW APPLICATION9 May 2006

a) both an extension and alterations to the facades of the existing showroom including signage b) alterations to the rear facade of the existing workshop and c) construction of a concrete decked sales yard with a contrete access stairs and a metal vehicle access ramp and associated site works

Quartertown Ind. Estate Quartertown Mallow Co. Cork.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?