Rear of No. 28 Bengal Terrace, Glasnevin, Dublin 11
REFUSE PERMISSIONPlanning application 3875/23
Dublin - Dublin City Council
Proposed Development
PERMISSION: For demolition of existing storage shed, removal of existing rear gate with part of block boundary wall, construction of 3-storey mews building comprising 1 no. 2-bedroom ground floor apartment and 1 no. 2-bedroom duplex dwelling, 2 no. parking spaces accessed from lane, refuse bins enclosure, boundary treatment and all ancillary site works at rear of No. 28 Bengal Terrace, Glasnevin, Dublin 11.
Application Timeline
Application received
1 Jun 2023
Decision due
26 Jul 2023
Decision: REFUSE PERMISSION
26 Jul 2023
Appeal submitted
23 Aug 2023
Appeal decided: REFUSE PERMISSION
13 Jun 2024
Application Details
- Location
- Rear of No. 28 Bengal Terrace, Glasnevin, Dublin 11
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dublin City Council
- Site Area
- 190 ha
Timeline
- Registration Date
- 1 June 2023
- Status
- Appeal Decided
- Decision
- REFUSE PERMISSION
- Decision Date
- 26 July 2023
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-317857-23
- Decision
- REFUSE PERMISSION
- Submitted
- 23 August 2023
- Decided
- 13 June 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A change of use from 3 apartments to a single dwelling, the removal of the existing rear extension, the construction of a new part two-storey, part one-storey extension to the rear of existing house and new rooflight to rear of existing roof.
30, Bengal Terrace, Finglas Road, Glasnevin, Dublin 11, D11 N7D0
The development will consist of: a change of use from 3 apartments to a single dwelling, the removal of the existing rear extension, the construction of a new part two-storey, part one-storey extension to the rear of existing house and new rooflight to rear of existing roof.
30, Bengal Terrace, Finglas Road, Glasnevin, Dublin 11 D11 N7D0
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC
Planning permission for the conversion of attic to storage space with 2no. roof lights to north east roof slope and 2no. rooflights and dormer to south west roof slope.
27 Finglas Road, Harts Corner, Dublin 11
Conversion of attic to storage space with 2no. roof lights to North East roof slope and 2no.rooflights and dormer to South West roof slope.
27, Finglas Road, Dublin 11
The development will consist of the removal of the existing single storey rear extensions to the rear (north) and partial removal of the two storey external walls to the rear and side, external modifications to include repair & repointing of the existing brick façades to nos. 3&4, to allow for the 3-storey extensions to the rear (north) of nos. 3-4 Prospect Square, a 3-storey extension to rear & side (east) of no.5 Prospect Square; full removal of roofs at nos. 3,4&5 Prospect Square to allow for the subsequent new second floor extension to the front, rear & side, comprising of roof terraces to the entire front façade, two bay windows to side, one balcony and two Juliet-style balconies to rear; the 2no. terraced houses at nos. 3&4 Prospect Square to be reconfigured to allow for a one-bed residential unit on ground floor and a two-bed duplex on first and second floor; modifications to the existing fenestration on the side of no.5 Prospect Square; 5 no. new rooflights within new zinc roof to all units; 2 bicycle spaces to one-bed unit within a private rear yard, 3 bicycle spaces to a 2-bed unit within rear service yard; new balustrade and planting to existing front parapet to all units; internal modifications to all existing layouts; and all associated site works to 2no. existing two-storey terraced houses at nos. 3&4 Prospect Square and 2-storey end-of-terrace at no.5 Prospect Square.
3-5, Prospect Square, Glasnevin, Dublin 9 D09 AP62
Permission for demolition of single storey rear return and construction of part single storey part two storey extension to rear of existing three storey house along with a new rooflight to front section of roof and all associated site works.
17, Finglas Road, Dublin 11
Demolition of existing rear return and construction of new extension to ground and first floor with dormer extension to roof
18, Finglas Road, Finglas, Dublin 11
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?