30, Bengal Terrace, Finglas Road, Glasnevin, Dublin 11, D11 N7D0

GRANT PERMISSION

Planning application WEB2124/22

Dublin - Dublin City Council

Proposed Development

A change of use from 3 apartments to a single dwelling, the removal of the existing rear extension, the construction of a new part two-storey, part one-storey extension to the rear of existing house and new rooflight to rear of existing roof.

Application Timeline

  1. Application received

    14 Dec 2022

  2. Decision due

    16 Feb 2023

  3. Decision: GRANT PERMISSION

    16 Feb 2023

  4. Grant issued

    3 Apr 2023

Application Details

Location
30, Bengal Terrace, Finglas Road, Glasnevin, Dublin 11, D11 N7D0
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
495 ha

Timeline

Registration Date
14 December 2022
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
16 February 2023
Grant Date
3 April 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
WEB2089/22APPLICATION DECLARED INVA5 Dec 2022

The development will consist of: a change of use from 3 apartments to a single dwelling, the removal of the existing rear extension, the construction of a new part two-storey, part one-storey extension to the rear of existing house and new rooflight to rear of existing roof.

30, Bengal Terrace, Finglas Road, Glasnevin, Dublin 11 D11 N7D0

20m
3875/23REFUSE PERMISSION1 Jun 2023

PERMISSION: For demolition of existing storage shed, removal of existing rear gate with part of block boundary wall, construction of 3-storey mews building comprising 1 no. 2-bedroom ground floor apartment and 1 no. 2-bedroom duplex dwelling, 2 no. parking spaces accessed from lane, refuse bins enclosure, boundary treatment and all ancillary site works at rear of No. 28 Bengal Terrace, Glasnevin, Dublin 11.

Rear of No. 28 Bengal Terrace, Glasnevin, Dublin 11

28m
WEB1097/26ADDITIONAL INFORMATION16 Jan 2026

The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.

The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC

71m
WEB1097/26ADDITIONAL INFORMATION16 Jan 2026

The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.

The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC

106m
WEB1097/26ADDITIONAL INFORMATION16 Jan 2026

The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.

The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC

109m
2453/21GRANT PERMISSION24 Mar 2021

Planning permission for the conversion of attic to storage space with 2no. roof lights to north east roof slope and 2no. rooflights and dormer to south west roof slope.

27 Finglas Road, Harts Corner, Dublin 11

109m
WEB1218/21APPLICATION DECLARED INVA8 Mar 2021

Conversion of attic to storage space with 2no. roof lights to North East roof slope and 2no.rooflights and dormer to South West roof slope.

27, Finglas Road, Dublin 11

140m
WEB5194/21GRANT PERMISSION13 Dec 2021

Permission for demolition of single storey rear return and construction of part single storey part two storey extension to rear of existing three storey house along with a new rooflight to front section of roof and all associated site works.

17, Finglas Road, Dublin 11

151m
WEB1047/21APPLICATION DECLARED INVA21 Jan 2021

Demolition of existing rear return and construction of new extension to ground and first floor with dormer extension to roof

18, Finglas Road, Finglas, Dublin 11

151m
WEB1120/21APPLICATION DECLARED INVA12 Feb 2021

Demolition of existing single storey rear return. Construction of new part single storey, part two storey extension to rear. Construction of new dormer window to rear to facilitate attic conversion to habitable room. All associated site works.

18, Finglas Road, Glasnevin, Dublin 11