← Back to search

56, Botanic Road, Glasnevin, Dublin 9, D09 X5P8

GRANT PERMISSION

Planning application WEB5096/21

Dublin - Dublin City Council

Proposed Development

The development will consist of a new vehicular entrance to the front garden.

Application Timeline

  1. Application received

    10 Nov 2021

  2. Decision due

    13 Jan 2022

  3. Decision: GRANT PERMISSION

    13 Jan 2022

  4. Grant issued

    25 Feb 2022

Application Details

Location
56, Botanic Road, Glasnevin, Dublin 9, D09 X5P8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
197.11 ha

Timeline

Registration Date
10 November 2021
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
13 January 2022
Grant Date
25 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
WEB1098/22REFUSE RETENTION PERMISSI8 Feb 2022

RETENTION & PERMISSION: I, Amirsad Zalli seek indefinite retention of existing partial roof alterations and full planning permission for amendment of the remaining roof which would include the raising of the front ridge line, construction of attic extension to rear of new roof ridge line and a two-storey rear extension including internal modifications of existing house along with all associated site works at 54 Botanic Road, Dublin 9, D09 N8H.

54, Botanic Road, Dublin 9, D09 N8H3

34m
3421/25GRANT PERMISSION13 Oct 2025

The development will consist of demolition of a single storey rear garage and construction of a new two storey two-bedroom house with rear garden and ancillary site works. New house to be accessed off Prospect Avenue .

Rear of 46 Botanic Road, Glasnevin, Dublin 9, D09C7F6

36m
4131/24GRANT PERMISSION8 Aug 2024

Permission for development at rear of 46 Botanic Road, Glasnevin, Dublin 9 D09C7F6. The development will consist of demolition of a single storey rear garage and construction of a new two storey one-bedroom house with roof garden to the rear, and ancillary site works. New house to be accessed off Prospect Avenue.

Rear of 46 Botanic Road, Glasnevin, Dublin, D09C7F6

82m
WEB1097/26ADDITIONAL INFORMATION16 Jan 2026

The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements: • Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein: - The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147). - The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232). - The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131). The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232). The proposed underground cable routes will incorporate the following elements: • Communication links and fibre optic cables between all substations in the same trench as the UGC; • Joint bays and communication chambers along the UGC alignment; • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings. • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.

The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC

111m
WEB1047/21APPLICATION DECLARED INVA21 Jan 2021

Demolition of existing rear return and construction of new extension to ground and first floor with dormer extension to roof

18, Finglas Road, Finglas, Dublin 11

111m
WEB1120/21APPLICATION DECLARED INVA12 Feb 2021

Demolition of existing single storey rear return. Construction of new part single storey, part two storey extension to rear. Construction of new dormer window to rear to facilitate attic conversion to habitable room. All associated site works.

18, Finglas Road, Glasnevin, Dublin 11

111m
WEB1155/21APPLICATION DECLARED INVA22 Feb 2021

Demolition of existing single storey rear return Construction of new part single storey, part two storey extension to rear Construction of new dormer window to rear to facilitate attic conversion to habitable room All associated site works

18, Finglas Road, Glasnevin, Dublin 11

111m
WEB1157/21APPLICATION DECLARED INVA23 Feb 2021

Demolition of existing single storey rear return Construction of new part single storey, part two storey extension to rear Construction of new dormer window to rear to facilitate attic conversion to habitable room All associated site works

18, Finglas Road, Glasnevin, Dublin 11

111m
WEB1160/21APPLICATION DECLARED INVA23 Feb 2021

Demolition of existing single storey rear return Construction of new part single storey, part two storey extension to rear Construction of new dormer window to rear to facilitate attic conversion to habitable room All associated site works

18, Finglas Road, Glasnevin, Dublin 11

111m
WEB1161/21APPLICATION DECLARED INVA23 Feb 2021

Demolition of existing single storey rear return Construction of new part single storey, part two storey extension to rear Construction of new dormer window to rear to facilitate attic conversion to habitable room All associated site works

18, Finglas Road, Glasnevin, Dublin 11

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?