← Back to search

St Annes , Upper William Street , Athy Co. Kildare

CONDITIONAL

Planning application 211565

Kildare - Kildare County Council

Proposed Development

for the following works; 2-storey garage/bedroom extension to side of dwelling, conversion of attic to bedroom accommodation, rear extension, conservatory, shed, glasshouse, workshop and 2nd vehicular entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Nov 2021

  2. Further information requested

    20 Dec 2021

  3. Further information received

    14 Jan 2022

  4. Decision: CONDITIONAL

    9 Feb 2022

  5. Decision due

    10 Feb 2022

  6. Grant issued

    23 Mar 2022

Application Details

Location
St Annes , Upper William Street , Athy Co. Kildare.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.1 ha

Timeline

Registration Date
3 November 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 February 2022
Grant Date
23 March 2022
Permission Expires
22 March 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

111m
17240CONDITIONAL7 Mar 2017

the upgrade of part of the existing production building to include the following: (i) Removal of part of the first floor of the existing building (243sqm); (ii) Removal of part of the existing roof structure, cladding and associated structure (1448sqm); (iii) Erection of new structure within the production building (1448sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m and all associated site development works

Bleach Townland , Upper William Street , Athy

128m
191024CONDITIONAL13 Sept 2019

The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank

The Maltings , Athy , Co. Kildare.

138m
17262N/A9 Mar 2017

new signage to facilitate the rebranding of the Athy Business Campus and Woodstock Industrial Estate at the Athy Business Park including the installation of two signs at the main entrance on the Kilkenny Road, three wayfinding totems positioned at various access routes within the development and all associated site development works

Athy Business Campus and Woodstock Industrial Estate , Kilkenny Road , Athy

143m
18479CONDITIONAL27 Apr 2018

a 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development

The Maltings , Athy , Co. Kildare.

146m
17363N/A5 Apr 2017

new signage to facilitate the rebranding of the Athy Business Campus and Woodstock Industrial Estate as the Athy Business Park, including the installation of two signs at the main entrance on the Kilkenny Road, three wayfinding totems positioned at various access routes within the development and all associated site development works

Athy Business Campus and Woodstock Industrial Estate , Kilkenny Road , Athy

151m
17899CONDITIONAL10 Aug 2017

to partially demolish and refurbish the existing single storey production building to facilitate the production of small roofing elements, with demolition of adjacent outbuildings. The works will include the following: (i) Removal of part of the existing production building (380sqm) to facilitate rotary batching chamber; (ii) Alter internal layout to provide toilets, lab, office, boiler and switch room; (iii) Removal of outbuildings and other surrounding buildings and reinstate area as concrete yard; (iv) Alterations to existing elevations including replacement of existing roof and wall cladding, removal of existing windows, replacement of existing doors with new doors to be provided; (v) Erection of silo (12.1m high); (vi) Provision of external loading bay, and all associated site development works

Bleach Townland , Upper William Street , Athy

167m
201582N/A21 Dec 2020

demolition of existing extension and construction of a 2 storey extension to rear

26 Pairc Bhride , Athy , Co. Kildare.

171m
21468N/A9 Apr 2021

the proposed works consist of: construct 4 No. 3 bedroom townhouse style dwellings, form connections to public services including foul water sewer, surface water sewer and watermains, together with all associated site works, including replacement of existing 2 No. trees located in grass margin fronting the site

12 & 13 Pairc Bhride , Athy , Co. Kildare.

172m
22634REFUSED27 May 2022

(Extension of Duration from previous planning file 161152 (& 18210)) a two storey dwelling and all ancillary site development works

12 Pairc Bhride , Athy , Co. Kildare

176m
21873REFUSED17 Jun 2021

to construct new extension to side of our existing property and alter some window opes

27 Pairc Bhride , Athy , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?