Proposed Development
constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works
Application Timeline
Application received
14 Jun 2021
Further information requested
5 Aug 2021
Application withdrawn
17 Aug 2022
Application Details
- Location
- Ballitore , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.88 ha
- Floor Area
- 4314.800000000001 sq m
- Residential Units
- 37
Timeline
- Registration Date
- 14 June 2021
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 17 August 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works
Ballitore , Athy , Co. Kildare
constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works
Ballitore , Co. Kildare
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works
Fullers Court Road , Ballitore , Co. Kildare
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works
Fullers Court Road , Ballitore , Co. Kildare
The development consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
Oak Way , Ballitore , Co. Kildare
consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
Oak Way , Ballitore , Co. Kildare
for constructing 8 No. semi-detached 2-storey houses. The development also consists of a new recessed vehicular entrance off Abby’s Row and a new recessed vehicular entrance off Cockpit Lane, new internal road network connecting Abby’s Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: A revised site layout consisting of 2 no 4 bed Detached two-storey dwellings, 4 no 3-bed semi-detached two-storey dwellings, 2 no 2 bed semi-detached two-storey dwellings, revised landscaping plans, submission of an Architectural Heritage Impact Assessment, Ecological Impact Assessment, tree and hedge survey, revised Part V submission and a Road Safety Audit. The development also consists of a new recessed vehicular entrance off Abby's Row and a new recessed vehicular exit to Cockpit Lane, new internal road network connecting Abby's Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works
Ballitore , Co. Kildare
constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies this application . Revised by Significant Further Information which consists of 1) alterations to site layout and 2) alterations to housing mix to now consist of 2 No.2 storey 4-bed detached houses and 1 No.2 storey 4- bed semi-detached house. 9 No. 2 storey 3-bed semi detached houses and 4 No.2 storey 2-bed semi-detached houses. Revised by significant further information which consists of alterations to housing mix now consist of 1 No. 2 storey 4-bed detached house. 1 No. 2 storey 4-bed detached house, 1 No. 2 storey 3-bed detached house, 10 No. 2 storey 3-bed semi-detached houses and 4 No.2 storey 2 bed semi detached houses. The significant further information is due to the unit mix been different from previous notices.
Fuller's Court Road , Ballitore , Co. Kildare
development consists of constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies and will be available for inspection at the office of the Planning Authority. Development
Fuller's Court Road , Ballitore , Co. Kildare.
for the construction of 2 no. single storey semi-detached dwellings, connection to existing foul water sewer, and all associated ancillary site-works
Cockpit Lane , Ballitore , Co. Kildare
The submission window has closed
Observations on this application closed on Sunday 18 July 2021, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?