Proposed Development

Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Feb 2024

  2. Further information requested

    17 Apr 2024

  3. Further information received

    15 Oct 2024

  4. Decision: CONDITIONAL

    4 Nov 2024

  5. Decision due

    11 Nov 2024

  6. Grant issued

    16 Dec 2024

Application Details

Location
Fullers Court Road , Ballitore , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Floor Area
171 sq m
Residential Units
1

Timeline

Registration Date
26 February 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
4 November 2024
Grant Date
16 December 2024
Permission Expires
15 December 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

14m
2440N/A1 Feb 2024

Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works

Fullers Court Road , Ballitore , Co. Kildare

93m
2561216CONDITIONAL25 Oct 2025

constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works

Ballitore , Co. Kildare

108m
2460189CONDITIONAL4 Mar 2024

for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works

Ballitore , Athy , Co. Kildare

110m
21859N/A14 Jun 2021

constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works

Ballitore , Co. Kildare

119m
2560427CONDITIONAL24 Apr 2025

for constructing 8 No. semi-detached 2-storey houses. The development also consists of a new recessed vehicular entrance off Abby’s Row and a new recessed vehicular entrance off Cockpit Lane, new internal road network connecting Abby’s Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: A revised site layout consisting of 2 no 4 bed Detached two-storey dwellings, 4 no 3-bed semi-detached two-storey dwellings, 2 no 2 bed semi-detached two-storey dwellings, revised landscaping plans, submission of an Architectural Heritage Impact Assessment, Ecological Impact Assessment, tree and hedge survey, revised Part V submission and a Road Safety Audit. The development also consists of a new recessed vehicular entrance off Abby's Row and a new recessed vehicular exit to Cockpit Lane, new internal road network connecting Abby's Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works

Ballitore , Co. Kildare

121m
2560476CONDITIONAL7 May 2025

for the construction of 2 no. single storey semi-detached dwellings, connection to existing foul water sewer, and all associated ancillary site-works

Cockpit Lane , Ballitore , Co. Kildare

133m
22955N/A3 Aug 2022

development consists of constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies and will be available for inspection at the office of the Planning Authority. Development

Fuller's Court Road , Ballitore , Co. Kildare.

138m
221166CONDITIONAL26 Sept 2022

constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies this application . Revised by Significant Further Information which consists of 1) alterations to site layout and 2) alterations to housing mix to now consist of 2 No.2 storey 4-bed detached houses and 1 No.2 storey 4- bed semi-detached house. 9 No. 2 storey 3-bed semi detached houses and 4 No.2 storey 2-bed semi-detached houses. Revised by significant further information which consists of alterations to housing mix now consist of 1 No. 2 storey 4-bed detached house. 1 No. 2 storey 4-bed detached house, 1 No. 2 storey 3-bed detached house, 10 No. 2 storey 3-bed semi-detached houses and 4 No.2 storey 2 bed semi detached houses. The significant further information is due to the unit mix been different from previous notices.

Fuller's Court Road , Ballitore , Co. Kildare

142m
18295REFUSED16 Mar 2018

53 dwellings consisting of 48 No. 2 storey terraced/joined houses, 2 No. 2 storey blocks (each containing 1 No. 1 bedroom and 1 No. 2 bedroom maisonette units), 1 No. 1 storey detached bungalow, site entrance and all ancillary site works

Fuller's Court Road , Ballitore , Co. Kildare.

143m
2560730N/A1 Jul 2025

for to construct 4 No. two storey semi detached dwellings, form connections to public services including foul water sewer, surface water sewer and water mains, including new boundary treatments, construct new vehicular entrances with all ancillary services and associated site works

Cockpit Lane , Ballitore , Co.Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?