← Back to search

Ballitore , Athy , Co. Kildare

CONDITIONAL

Planning application 2460189

Kildare - Kildare County Council

Proposed Development

for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2024

  2. Further information requested

    24 Apr 2024

  3. Further information received

    19 Jul 2024

  4. Decision: CONDITIONAL

    9 Aug 2024

  5. Decision due

    15 Aug 2024

  6. Appeal submitted

    3 Sept 2024

  7. Grant issued

    1 Nov 2024

Application Details

Location
Ballitore , Athy , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
1.6 ha
Floor Area
2329.2000000000007 sq m
Residential Units
21

Timeline

Registration Date
4 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 August 2024
Grant Date
1 November 2024
Permission Expires
31 October 2029

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-320714-24
Decision
WITHDRAWN
Submitted
3 September 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
21859N/A14 Jun 2021

constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works

Ballitore , Co. Kildare

81m
2561216CONDITIONAL25 Oct 2025

constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works

Ballitore , Co. Kildare

94m
2440N/A1 Feb 2024

Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works

Fullers Court Road , Ballitore , Co. Kildare

108m
2471CONDITIONAL26 Feb 2024

Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works

Fullers Court Road , Ballitore , Co. Kildare

160m
2660643N/A15 Jun 2026

The development consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works

Oak Way , Ballitore , Co. Kildare

169m
2660627N/A11 Jun 2026

consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works

Oak Way , Ballitore , Co. Kildare

183m
2560427CONDITIONAL24 Apr 2025

for constructing 8 No. semi-detached 2-storey houses. The development also consists of a new recessed vehicular entrance off Abby’s Row and a new recessed vehicular entrance off Cockpit Lane, new internal road network connecting Abby’s Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: A revised site layout consisting of 2 no 4 bed Detached two-storey dwellings, 4 no 3-bed semi-detached two-storey dwellings, 2 no 2 bed semi-detached two-storey dwellings, revised landscaping plans, submission of an Architectural Heritage Impact Assessment, Ecological Impact Assessment, tree and hedge survey, revised Part V submission and a Road Safety Audit. The development also consists of a new recessed vehicular entrance off Abby's Row and a new recessed vehicular exit to Cockpit Lane, new internal road network connecting Abby's Row and Cockpit Lane, connection to foul water sewer, and all associated ancillary site-works

Ballitore , Co. Kildare

217m
2560476CONDITIONAL7 May 2025

for the construction of 2 no. single storey semi-detached dwellings, connection to existing foul water sewer, and all associated ancillary site-works

Cockpit Lane , Ballitore , Co. Kildare

219m
2560639CONDITIONAL9 Jun 2025

for constructing 8 No. dwellings consisting of 2 No. detached 2-storey houses and 2 No. 2-storey terrace blocks consisting of 3 No. houses each. The development also consists of individual domestic vehicular entrances off Abbeyfield and Mill Lane, new shared cycle / footpath along Mill Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: The principal amendments to the original scheme entail 1) revised site layout including revised access arrangements; 2) revised building designs; 3) revised landscaping and boundary treatments; and 4) revised location of cycle path

Ballitore , Athy , Co. Kildare

219m
221166CONDITIONAL26 Sept 2022

constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies this application . Revised by Significant Further Information which consists of 1) alterations to site layout and 2) alterations to housing mix to now consist of 2 No.2 storey 4-bed detached houses and 1 No.2 storey 4- bed semi-detached house. 9 No. 2 storey 3-bed semi detached houses and 4 No.2 storey 2-bed semi-detached houses. Revised by significant further information which consists of alterations to housing mix now consist of 1 No. 2 storey 4-bed detached house. 1 No. 2 storey 4-bed detached house, 1 No. 2 storey 3-bed detached house, 10 No. 2 storey 3-bed semi-detached houses and 4 No.2 storey 2 bed semi detached houses. The significant further information is due to the unit mix been different from previous notices.

Fuller's Court Road , Ballitore , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?