Curragh Farm , Ballymany , Newbridge
CONDITIONALPlanning application 2560025
Kildare - Kildare County Council
Proposed Development
for Large-scale Residential Development (LRD) at this site at Curragh Farm, Ballymany, Newbridge, Co. Kildare. The development will consist of amendments and alterations to previously permitted strategic housing development granted by An Bord Pleanála (the “Board”) (Board ref. ABP-312704-22) comprising the omission from the previously permitted development of 20 no. dwellings at the southern end of the site at Curragh Farm, Ballymany, Newbridge, Co Kildare. The lands the subject of these 20 no. dwellings cannot now be developed, as 14 no. dwellings have been completed on those lands under and in accordance with a separate permission granted by the Board (Board ref. ABP-249038-17, Council ref. 16/0658). Permission is also sought for alterations to 2 no. public open spaces to facilitate surface water management features comprising a detention basin and pond/wetland
View the full application file on the council's planning portal →Application Timeline
Application received
16 Jan 2025
Further information requested
12 Mar 2025
Further information received
2 May 2025
Decision due
29 May 2025
Decision: CONDITIONAL
29 May 2025
Appeal submitted
24 Jun 2025
Appeal decided: MODIFIED
23 Sept 2025
Grant issued
10 Dec 2025
Application Details
- Location
- Curragh Farm , Ballymany , Newbridge
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 7.9 ha
Timeline
- Registration Date
- 16 January 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 May 2025
- Grant Date
- 10 December 2025
- Permission Expires
- 9 December 2030
An Coimisiún Pleanála Appeal
- Appeal Reference
- ACP-322882-25
- Decision
- MODIFIED
- Submitted
- 24 June 2025
- Decided
- 23 September 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
SHD - ABP DECISION - Development consisting of 336 no residential units and a creche facility. (245 no. houses, 27 no apartments and 64 no. duplexes) creche and associated works
Ballymany , Newbridge , Co.Kildare
1) Raise the ridge height of my house on the left hand side as viewed from the public road by a height of approximately one meter over a distance of seven meters. 2) Construct a first floor extension over the length of the raised ridge leading to a full two storey extension. 3) To construct a single storey bathroom extension to the right hand side when viewed from the public road. 4) All ancillary ground works associated with the proposed works
Aineoin , Standhouse Road , Newbridge
to alter the front elevation of the house. The alterations consist of 1) Remove the glass roof from the front porch. 2) Replace said glass roof with a timber slated roof. 3) Insert three number roof windows into the new slated roof. 4) All ancillary works connected with the above
Aineoin Standhouse Road , Newbridge , Co. Kildare.
retention of the following: ground floor single storey extension of the existing habitable area in the form of an enclosed porch/recreational area to the front of the existing property. Ground floor single storey extension of the habitable area to the rear. Ground floor single storey extension of the habitable area to the West (incorporating a storage area at mezzanine level), change of locations of the chimneys and internal layout of the original house within the original footprint. Change of size of windows located on the rear and front elevation walls
Aineoin , Standhouse Road , Newbridge
the erection of a 12-metre high Ballstop along the western boundary of the existing school playing field (located to the rear of the existing school) together with all associated siteworks
Scoil Muire Senior National School , Standhouse Road , Ballymany
for modification (under Section 34(3C) of the Planning & Development Act, 2000, as amended) to previously permitted development, planning Ref. ABP-312704-22 for 336 no. dwellings and creche. Modifications comprise a reduction in overall site area, with a reduction in residential units from 336 to 316, with all remaining units as permitted
Ballymany , Newbridge , Co. Kildare
to erect Boundary and Security fencing on the perimeter of the schools with pedestrian and vehicle access gates
Scoil Mhuire Senior and Junior School , Ballymany , Newbridge
Development will consist of to erect Boundary and Security fencing on the perimeter of the schools with pedestrian and vehicle access gates.
Scoil Mhuire Sinsearach , Ballymany , Newbridge
(a) first floor extension/attic conversion to include raising roof, increasing pitch, a new dormer style window to the rear and 4 no. new rooflights to the front elevation, (b) internal modifications and all associated development works
Standhouse Road , Newbridge , Co. Kildare
the construction of a single storey detached dwelling, foul water to mains sewer, surface water to soakaways, recessed vehicular entrance and all associated site works
Blackberry Lane , Morristownbiller , Newbridge
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?