Prospect House , Mullamast , Athy
CONDITIONALPlanning application 2660515
Kildare - Kildare County Council
Proposed Development
a new dwelling house, alterations to existing house entrance, septic tank treatment system, percolation area and all associated site works
Application Timeline
Application received
14 May 2026
Further information requested
7 Jul 2026
Further information received
27 Jul 2026
Decision: CONDITIONAL
19 Aug 2026
Decision due
23 Aug 2026
Grant issued
24 Sept 2026
Application Details
- Location
- Prospect House , Mullamast , Athy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.281 ha
- Floor Area
- 183 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 14 May 2026
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 August 2026
- Grant Date
- 24 September 2026
- Permission Expires
- 23 September 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a new dwelling house with attached garage, new site entrance, septic tank treatment system, percolation area and all associated site works
Mullamast , Athy , Co. Kildare.
for the construction of a single storey extension to the side of the existing dwelling and all associated site works
Mullaghmast , Ballitore , Co.Kildare
for a domestic garage along with all associated site development and facilitating works
Mullamast , Ballitore , Athy
for the construction of a detached, single-storey dwelling accessed from the existing entrance and avenue to Mullamast House; the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including waste water treatment system and percolation area
Mullamast House , Mullamast , Athy Co. Kildare.
the erection of a straw bedded cattle shed with a soiled water tank and working aprons with all associated facilities and site works
Mullamast , Ballitore , Athy
consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
Oak Way , Ballitore , Co. Kildare
The development consists of constructing 36 no. dwellings. The dwellings will consist of 2 no. apartments in 1 no. 2-storey block, 26 no. semi-detached 2-storey houses, 4 no. detached 2-storey houses and 1 no. 2-storey block containing 4 no. houses. The development also consists of individual bin/bike stores for each mid-terrace unit, connection to foul water sewer, and all associated ancillary site-works
Oak Way , Ballitore , Co. Kildare
constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works
Ballitore , Co. Kildare
constructing 1 No. creche unit 1 block containing 4 No. ground floor commercial units and 4 No. first floor apartment units, 1 No. detached bin store, and 33 No. dwellings. The dwellings consist of 4 No. 2 storey semi-detached houses and 29 No. 2 storey terraced houses in 7 No. blocks. The development also includes a new recessed vehicular entrance, provision of part road as defined in the KCC Development Plan 2017-2023, connection to existing foul sewer and all associated ancillary site-works
Ballitore , Co. Kildare
for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works
Ballitore , Athy , Co. Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?