LOUGH BOORA DISCOVERY PARK BOORA TULLAMORE , CO. OFFALY , R35 R220
N/APlanning application 23256
Offaly - Offaly County Council
Proposed Development
A RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C. 5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10 - 15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MÓNA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPLICATION
Application Details
- Location
- LOUGH BOORA DISCOVERY PARK BOORA TULLAMORE , CO. OFFALY , R35 R220
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- 2 June 2023
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C.5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10-15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MONA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPICATION
LOUGH BOORA DISCOVERY PARK , LEABEG , BOORA TULLAMORE CO. OFFALY
UPGRADING AND EXTEND EXISTING DERELICT DWELLING , TO CONVERT , UPGRADE AND EXTEND EXISTING OUTBUILDING INTO AN ATTACHED ANNEX WITH 1ST FLOOR ELEMENT , PERMISSION IS ALSO SOUGHT TO UPGRADE EXISTING SITE BOUNDARIES AND EXISTING DRIVEWAY AND TO DECOMMISSION EXISTING WELL AND SEPTIC TANK AND REPLACE SAME WITH A NEW CONNECTION TO PUBLIC WATERMAIN AND A NEW SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
LEA BEG BOORA , BLUEBALL TULLAMORE , CO.OFFALY
A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKS
LEABEG BLUEBALL , CO. OFFALY , R35 FX79
construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.
Leabeg , Boora Blueball , Co. Offaly
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKS
LEA BEG , TULLAMORE , CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR PORTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
BOORA AVENUE LEA BEG , BOORA BLUEBALL , TULLAMORE CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE NAMELY A GASTRO PUB SERVING FOOD AND TO CONSTRUCT A SIDE EXTENSION TO SAME, ALTERATIONS TO THE EXISTING FRONT ELEVATION TO INCLUDE PROPOSED NEW MAIN ENTRANCE FRONT DOOR WITH FLAT ROOFED AREA AND WINDOWS TO REPLACE EXISTING DOORS, REMOVAL OF CHIMNEYS AND CONSTRUCTION OF NEW FLAT ROOFED OUTDOOR DINING AREA TO THE SIDE AND REAR OF THE EXISTING BUILDING SOUTHERN END AND ALSO TO CONSTRUCT AN EXTERNAL STONE CLADDING WALL TO ENCLOSE AND OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE ADJACENT TO THE EXISTING BUILDING ON THE EASTERN BOUNDARY WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR GAMES ROOM FOR OCCUPANTS OF THE CARAVAN/GLAMPING PARK ONLY, INSTALLATION OF 6 NO. GLAMPING PODS TO INCLUDE 1 NO. DISABLED ACCESS COMPLIANT POD, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA FOR RESIDENTS OF THE CARAVAN/GLAMPING PARK, ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. BERTHING PITCHES FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA FOR AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR PORTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
BOORA AVENUE LEA BEG , BOORA BLUEBALL , TULLAMORE CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKS
BOORA AVENUE LEA BEG BOORA BLUEBALL , TULLAMORE , CO. OFFALY
BUILDING NEW DWELLING HOUSE, INSTALL EFFLUENT TREATMENT SYSTEM WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS
LEABEG , BOORA , CO.OFFALY
A 66M2 GRANNY FLAT SIDE EXTENSION CONSISTING OF AN ADDITIONAL KITCHEN, SITTING ROOM AND BEDROOM WITH ALTERATIONS TO THE LAYOUT OF THE EXISTING DWELLING
LEABEG , BOORA , CO. OFFALY
The submission window has closed
Observations on this application closed on Thursday 6 July 2023, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?