Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

N/A

Planning application 2460175

Offaly - Offaly County Council

Proposed Development

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

View the full application file on the council's planning portal →

Application Details

Location
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
3.9 ha

Timeline

Registration Date
20 May 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460199N/A31 May 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

5m
2460250CONDITIONAL3 Jul 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly

427m
18498N/A8 Nov 2018

A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE DEVELOPMENT WILL ALL BE CARRIED OUT AT THE EXISTING PREMISES OF WILLIAM GRANT & SONS

CLONMINCH , TULLAMORE , CO. OFFALY

428m
18519CONDITIONAL23 Nov 2018

A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING. THE EXTENSION WILL BE 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE

CLONMINCH , TULLAMORE , CO. OFFALY

438m
2460529CONDITIONAL23 Dec 2024

the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence.

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

448m
18380CONDITIONAL3 Sept 2018

A 15.0M X 10.0M X 5.0M HIGH STORAGE UNIT (150M2) WITH AN ADJACENT 7.5M X 4.5M X 3.0M HIGH FORKLIFT CHARGING STATION (34M2) WITH A CONCRETE STORAGE SLAB (650M2) AND ANCILLARY DRAINAGE WORKS. THE PROPOSED DEVELOPMENT IS FOR AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE

CLONMINCH , TULLAMORE , CO OFFALY

483m
20579CONDITIONAL25 Nov 2020

A COMPOUND CONTAINING 2 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 10MW AND ASSOCIATED TRANSFORMERS, INVERTERS, A SWITCHROOM BUILDING OF APPROXIMATELY 88M2 (CONTAINING SWITCH AND CONTROL ROOMS), INTERNAL CABLING, ELECTRICAL AND COMMUNICATIONS CABLES OF APPROXIMATELY 45M BETWEEN THE CONTROL BUILDING AND THE ADJACENT ESB 38KV CLONMINCH SUBSTATION AND ALL ANCILLARY DEVELOPMENT

CLONMINCH , TULLAMORE , CO. OFFALY

517m
19444CONDITIONAL12 Sept 2019

REPLACEMENT OF THE EXISTING 16M HIGH WOODEN POLE COMMUNICATION STRUCTURE WITH A 24 METRE HIGH FREE STANDING LATTICE COMMUNICATION STRUCTURE, CARRYING ANTENNAE AND COMMUNICATION DISHES WITH ASSOCIATED GROUND-MOUNTED EQUIPMENT. EXTENSION OF THE EXISTING COMMUNICATION COMPOUND TO ACCOMMODATE THE REPLACEMENT STRUCTURE WITH 2.4 METRE HIGH PALISADE FENCING TO MATCH THE EXISTING

ESB CLONMINCH 38KV SUBSTATION , TOWNLAND OF CLONMINCH TULLAMORE , CO OFFALY

525m
22281CONDITIONAL2 Jun 2022

THE REPLACEMENT OF THE EXISTING 16M HIGH WOOD POLE WITH A PROPOSED 24 METRE HIGH LATTICE TELECOMMUNICATIONS STRUCTURE WITH ANTENNAE, DISHES AND ASSOCIATED EQUIPMENT AND GROUNDWORKS. ACCESS VIA EXISTING SUBSTATION ENTRANCE

ESB TELECOM'S COMPOUND AT ESB'S CLONMINCH 38KV SUBSTATION , CLONMINCH LANE TOWNLAND OF CLONMINCH , TULLAMORE CO. OFFALY

567m
21217N/A15 Apr 2021

CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (441.5m2) INTO A VISITOR CENTRE WITH SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON EXISTING 50.50 HA SITE OF THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE

TULLAMORE DISTILLERY , BALLARD & CLONMINCH , CO. OFFALY

The submission window has closed

Observations on this application closed on Sunday 23 June 2024, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?