← Back to search

TULLAMORE DISTILLERY CAMPUS , BALLARD & CLONMINCH , CO.OFFALY

CONDITIONAL

Planning application 21275

Offaly - Offaly County Council

Proposed Development

CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (552.19 M2) INTO A VISITOR CENTRE WITH ANCILLARY SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING NEW TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON 0.0846 HA SITE LOCATED WITHIN THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 May 2021

  2. Further information requested

    5 Aug 2021

  3. Further information received

    9 Aug 2021

  4. Decision: CONDITIONAL

    3 Sept 2021

  5. Decision due

    5 Sept 2021

  6. Grant issued

    12 Oct 2021

Application Details

Location
TULLAMORE DISTILLERY CAMPUS , BALLARD & CLONMINCH , CO.OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.0846 ha

Timeline

Registration Date
5 May 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 September 2021
Grant Date
12 October 2021
Permission Expires
11 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

47m
21217N/A15 Apr 2021

CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (441.5m2) INTO A VISITOR CENTRE WITH SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON EXISTING 50.50 HA SITE OF THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE

TULLAMORE DISTILLERY , BALLARD & CLONMINCH , CO. OFFALY

233m
18380CONDITIONAL3 Sept 2018

A 15.0M X 10.0M X 5.0M HIGH STORAGE UNIT (150M2) WITH AN ADJACENT 7.5M X 4.5M X 3.0M HIGH FORKLIFT CHARGING STATION (34M2) WITH A CONCRETE STORAGE SLAB (650M2) AND ANCILLARY DRAINAGE WORKS. THE PROPOSED DEVELOPMENT IS FOR AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE

CLONMINCH , TULLAMORE , CO OFFALY

346m
2460529CONDITIONAL23 Dec 2024

the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence.

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

352m
18498N/A8 Nov 2018

A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE DEVELOPMENT WILL ALL BE CARRIED OUT AT THE EXISTING PREMISES OF WILLIAM GRANT & SONS

CLONMINCH , TULLAMORE , CO. OFFALY

354m
18519CONDITIONAL23 Nov 2018

A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING. THE EXTENSION WILL BE 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE

CLONMINCH , TULLAMORE , CO. OFFALY

387m
22108REFUSED9 Mar 2022

CONSTRUCTION OF A DWELLING HOUSE WITH A DOMESTIC GARAGE INCORPORATING A NEW SITE ENTRANCE, BOUNDARY TREATMENTS, CONNECTIONS TO EXISTING WATER MAIN, SEPTIC TANK WITH ADVANCED EFFLUENT TREATMENT SYSTEM AND ASSOCIATED SITE WORKS

BALLARD LANE BALLARD , TULLAMORE

606m
2460250CONDITIONAL3 Jul 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly

611m
2460175N/A20 May 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

611m
2460199N/A31 May 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

736m
18183CONDITIONAL25 Apr 2018

CONSTRUCTION OF A TWO STOREY DWELLING AND DOMESTIC GARAGE AND FOR THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND FOR ALL ANCILLARY SITE WORKS

BALLARD , TULLAMORE , CO OFFALY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?