← Back to search

CLONMINCH , TULLAMORE , CO. OFFALY

N/A

Planning application 18498

Offaly - Offaly County Council

Proposed Development

A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE DEVELOPMENT WILL ALL BE CARRIED OUT AT THE EXISTING PREMISES OF WILLIAM GRANT & SONS

View the full application file on the council's planning portal →

Application Details

Location
CLONMINCH , TULLAMORE , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council

Timeline

Registration Date
8 November 2018Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
2460529CONDITIONAL23 Dec 2024

the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence.

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

309m
21217N/A15 Apr 2021

CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (441.5m2) INTO A VISITOR CENTRE WITH SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON EXISTING 50.50 HA SITE OF THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE

TULLAMORE DISTILLERY , BALLARD & CLONMINCH , CO. OFFALY

352m
21275CONDITIONAL5 May 2021

CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (552.19 M2) INTO A VISITOR CENTRE WITH ANCILLARY SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING NEW TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON 0.0846 HA SITE LOCATED WITHIN THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE

TULLAMORE DISTILLERY CAMPUS , BALLARD & CLONMINCH , CO.OFFALY

427m
2460199N/A31 May 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

427m
2460175N/A20 May 2024

the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence

Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly

775m
19444CONDITIONAL12 Sept 2019

REPLACEMENT OF THE EXISTING 16M HIGH WOODEN POLE COMMUNICATION STRUCTURE WITH A 24 METRE HIGH FREE STANDING LATTICE COMMUNICATION STRUCTURE, CARRYING ANTENNAE AND COMMUNICATION DISHES WITH ASSOCIATED GROUND-MOUNTED EQUIPMENT. EXTENSION OF THE EXISTING COMMUNICATION COMPOUND TO ACCOMMODATE THE REPLACEMENT STRUCTURE WITH 2.4 METRE HIGH PALISADE FENCING TO MATCH THE EXISTING

ESB CLONMINCH 38KV SUBSTATION , TOWNLAND OF CLONMINCH TULLAMORE , CO OFFALY

810m
2367CONDITIONAL22 Feb 2023

THE CONSTRUCTION OF A PROPOSED FOUR-STOREY OFFICE BUILDING INCLUDING A PROPOSED ENTRANCE, CAR PARKING, LANDSCAPING AND ALL ASSOCIATED SITE WORKS

SITE 3 CENTRAL BUSINESS PARK , SPOLLANSTOWN CLONMINCH ROAD , TULLAMORE CO. OFFALY

955m
20212N/A8 Jun 2020

STRUCTURE AS BUILT TO DATE, AND PERMISSION FOR COMPLETION INCULDING CONVERSION OF SAME TO A FOUR- BEDROOM DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKS

THE MEWS VIOLET COTTAGE , CLONMINCH ROAD TULLAMORE , CO OFFALY

955m
20256REFUSED29 Jun 2020

STRUCTURE AS BUILT TO DATE, AND PERMISSION FOR COMPLETION INCLUDING CONVERSION OF SAME TO A FOUR-BEDROOM DWELLING HOUSE, AMENDMENTS TO ELEVATIONS, CONNECTION TO SERVICES AND ALL ASSOCIATED SITE WORKS

THE MEWS TO THE REAR OF VOILET COTTAGECLONMINCH ROAD , TULLAMORE , CO. OFFALY

1.0km
18183CONDITIONAL25 Apr 2018

CONSTRUCTION OF A TWO STOREY DWELLING AND DOMESTIC GARAGE AND FOR THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND FOR ALL ANCILLARY SITE WORKS

BALLARD , TULLAMORE , CO OFFALY

The submission window has closed

Observations on this application closed on Wednesday 12 December 2018, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?