Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
CONDITIONALPlanning application 2460529
Offaly - Offaly County Council
Proposed Development
the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence.
Application Timeline
Application received
23 Dec 2024
Decision: CONDITIONAL
27 Feb 2025
Decision due
3 Mar 2025
Grant issued
3 Apr 2025
Application Details
- Location
- Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 0.006 ha
- Floor Area
- 58.88 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 December 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 February 2025
- Grant Date
- 3 April 2025
- Permission Expires
- 2 April 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE DEVELOPMENT WILL ALL BE CARRIED OUT AT THE EXISTING PREMISES OF WILLIAM GRANT & SONS
CLONMINCH , TULLAMORE , CO. OFFALY
A NEW ONE STOREY EXTENSION TO THE EXISTING CASK QUALITY STATION BUILDING. THE EXTENSION WILL BE 180 SQUARE METRES IN AREA AND 6300MM HIGH. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE
CLONMINCH , TULLAMORE , CO. OFFALY
A 15.0M X 10.0M X 5.0M HIGH STORAGE UNIT (150M2) WITH AN ADJACENT 7.5M X 4.5M X 3.0M HIGH FORKLIFT CHARGING STATION (34M2) WITH A CONCRETE STORAGE SLAB (650M2) AND ANCILLARY DRAINAGE WORKS. THE PROPOSED DEVELOPMENT IS FOR AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENCE
CLONMINCH , TULLAMORE , CO OFFALY
CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (441.5m2) INTO A VISITOR CENTRE WITH SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON EXISTING 50.50 HA SITE OF THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE
TULLAMORE DISTILLERY , BALLARD & CLONMINCH , CO. OFFALY
CHANGE OF USE OF EXISTING THREE STOREY THREE SISTERS ADMINISTRATION BUILDING (552.19 M2) INTO A VISITOR CENTRE WITH ANCILLARY SHOP TO INCLUDE MATERIAL ALTERATIONS TO THE EXISTING ENTRANCE COMPRISING NEW TIMBER ENTRANCE SURROUND AND PERMISSION SOUGHT FOR 1 NO. EXTERNAL SIGN AT THE MAIN SITE ENTRANCE AND 1 NO. EXTERNAL TOTEM SIGN AT THE PROPOSED VISITOR CENTRE ENTRANCE ALL ON 0.0846 HA SITE LOCATED WITHIN THE TULLAMORE DISTILLERY CAMPUS. THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES AND IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION PREVENTION AND CONTROL LICENSE
TULLAMORE DISTILLERY CAMPUS , BALLARD & CLONMINCH , CO.OFFALY
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance access track on the site to the solar PV development, installation of underground cable to connect the transformer station and the distillery and site works required to facilitate the development including the provision of a secondary vehicle access and gate on the northern boundary of the site. The proposed development is for modifications to an establishment to which the major accidents directive applies and is for the purposes of an activity requiring an integrated pollution prevention and control licence
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly
CONSTRUCTION OF A DWELLING HOUSE WITH A DOMESTIC GARAGE INCORPORATING A NEW SITE ENTRANCE, BOUNDARY TREATMENTS, CONNECTIONS TO EXISTING WATER MAIN, SEPTIC TANK WITH ADVANCED EFFLUENT TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
BALLARD LANE BALLARD , TULLAMORE
A COMPOUND CONTAINING 2 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 10MW AND ASSOCIATED TRANSFORMERS, INVERTERS, A SWITCHROOM BUILDING OF APPROXIMATELY 88M2 (CONTAINING SWITCH AND CONTROL ROOMS), INTERNAL CABLING, ELECTRICAL AND COMMUNICATIONS CABLES OF APPROXIMATELY 45M BETWEEN THE CONTROL BUILDING AND THE ADJACENT ESB 38KV CLONMINCH SUBSTATION AND ALL ANCILLARY DEVELOPMENT
CLONMINCH , TULLAMORE , CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?