Sligo University Hospital , The Mall , Rathquarter
CONDITIONALPlanning application 17487
Sligo - Sligo County Council
Proposed Development
PP - for development consisting of the construction of a single storey extension, 27sqm, to the existing CSSD department, replacement of existing windows to powder coated aluminium glazing on the south elevation, provision of a single story temporary CSSD unit for use during construction, 190 sqm, ancillary site works and all associated ground works. the new building is within the curtilage of a protected structure
View the full application file on the council's planning portal →Application Timeline
Application received
22 Dec 2017
Decision: CONDITIONAL
19 Feb 2018
Decision due
24 Feb 2018
Grant issued
26 Mar 2018
Application Details
- Location
- Sligo University Hospital , The Mall , Rathquarter
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.231 ha
Timeline
- Registration Date
- 22 December 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 February 2018
- Grant Date
- 26 March 2018
- Permission Expires
- 25 March 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the construction of a 332.5m2 development at Level 8 & roof level of the multi-storey block over the existing Paediatric Department on level 7. The development shall comprise (1) New 258 m2 extension to the existing Intensive Care Ward at level 8 consisting of 4 new isolation rooms with associated stores, utility rooms, circulation areas and access off existing isolation ward (2) Construction of new 74.5m2 associated plant room at roof level, with all associated connections to existing site services infrastructure. Sligo University Hospital Campus contains a Protected Structure RPS no 217SE. The proposed extensions not in immediate contact with the protected structure.
South East Corner of Sligo Regional Hospital , The Mall , Rathquarter
Construct a 3 story 344m2 Nuclear Medicine extension block. The development shall comprise the following:(1) Level 3 - 134m2 Nuclear Medicine ward, (2) Level 4 – 114m2 Office Block, (3) Level 5 - 96 m2 Plant Room, (4) alteration to existing staff entrance, (5) all associated site works and services.
Sligo University Hospital , The Mall , Sligo
The previously granted permission PL25/60044 comprised a three-storey, 344 m² Nuclear Medicine extension. The proposed amendments to permission PL25/60044 comprise the following: (1) Changes to the layout and elevations through the addition of a 96 m² shell and core storey at Level 6. The total floor area of the Nuclear Medicine extension block, as amended, will be 440 m². (2) Changes to the layout and elevations through the introduction of a shell and core area in lieu of the plant room at Level 5.
Sligo University Hospital , The Mall , Sligo
development comprising; 1. Accessibility and aesthetic improvements to the Out-Patient’s entrance including the provision of a covered ramp, stairs and lift (418m²) and refurbishment of the existing OPD concourse 2. Retention of covid measures to segregate the Emergency Department (red zone) from General Hospital Circulation (green Zone) including temporarily moving the principle public access to The Out Patients Department Entrance on Level 3 on the south façade (The Mall Carpark Side) 3. Provision of 2 no. bus shelters for the shuttle bus service 4. Creation of a new pedestrian access off The Mall giving direct access to the Medial Beds Department under croft (PL18/392 & PL20/375 refer) and temporary main Entrance, with canopy over 5. Provision of a covered walkway to the temporary main entrance 6. Construction of a new internal access road off the main hospital access road, associated retaining walls and site works 7. Alterations to The Mall entrance to improve traffic flow, car park layout, site levels and cycle storage provisions all necessary to enable the above Medical Beds development 8. Minor alterations to parking and road layouts adjacent to the Renal Department to facilitate phasing and delivery of the Medical Beds development (PL18/392 & PL20/375 refer) with minimal disruption or loss of capacity 9. Proposed new signage to assist wayfinding traffic management and orientation. Including all associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed works are not in immediate contact with the protected structure.
Sligo University Hospital , The Mall , Rathquarter
The development will consist of the construction of a single storey 48.90m² laundry storage facility and to relocate an existing bicycle shelter at Sligo University Hospital
Sligo University Hospital , The Mall Rathquarter , Sligo
construct a dwelling house, connect to existing services and carry out ancillary site works
Ardaghowen Lane , Rathquarter Td. , Sligo
for the retention of temporary accommodation previously granted under PL 05/148 (5 year temporary permission). The accommodation comprises an 33.6m2 Modular Unit providing Paediatric Diabetes Services. It is intended that this accommodation would be removed from the site with in a period of 5 years from grant of retention permission
Sligo University Hospital , The Mall , Sligo.
The installation of approximately 2,300 photovoltaic (PV) panels, each measuring 2,000mm x 1,000mm, resulting in a combined coverage area of approximately 4,600 m² across the roofs of existing buildings within the hospital campus, including the Specialist Mental Health Unit (SMHU) and the Northwest Hospice, along with all associated works. Protected Structure: The proposed development is situated within the curtilage of a Protected Structure: Block A, A 1940's institutional building of regional significance listed under the National Inventory of Architectural Heritage (NIAH Reg. No. 32008001).
Sligo University Hospital campus , The Mall , Rathquarter Sligo
The installation of approximately 2,300 photovoltaic (PV) panels, each measuring 2,000mm x 1,000mm, resulting in a combined coverage area of approximately 4,600 m² across the roofs of existing buildings within the hospital campus, including the Protected Structure (Block A), the recently completed Specialist Mental Health Unit (SMHU) and the Northwest Hospice under construction. The site includes a 1940’s institutional building (identified as Block A in the application) of regional significance listed under the National Inventory of Architectural Heritage (NIAH Reg. No. 32008001). The proposed development is located both at and within the curtilage of this Protected Structure.
Sligo University Hospital Campus , The Mall , Rathquarter Sligo
The development will consist of the installation of a two storey modular support unit (149m2), and associated site development works and services at Sligo University Hospital, The Mall, Rathquarter, Sligo. F91 H684. Sligo University Hospital is a protected structure, reg. no. 32008001., the proposed works are not in immediate contact with the protected structure.
Sligo University Hospital , The Mall Rathquarter , Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?