← Back to search

Cregg , Rosses Point , Co Sligo

REFUSED

Planning application 19103

Sligo - Sligo County Council

Proposed Development

Development consisting of the construction of a dwelling with a waste water treatment system, packaged tertiary treatment system and distribution area, soak away for storm drainage and all ancillary site works. A Natura Impact Statement is submitted to the planning authority with the application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Mar 2019

  2. Decision: REFUSED

    1 May 2019

  3. Decision due

    15 May 2019

Application Details

Location
Cregg , Rosses Point , Co Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.42 ha
Floor Area
345.3 sq m
Residential Units
1

Timeline

Registration Date
21 March 2019
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
1 May 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22145REFUSED26 Apr 2022

development consisting of (1) partial demolition of existing boat shed (2) conversion of boat shed & erection of dwelling in lieu (3) wastewater treatment system (4) and all associated site works

Cregg , Rosses Point , Co. Sligo

78m
2151CONDITIONAL22 Feb 2021

development consisting of the construction of a Synthetic Grass Tennis Court with Perimeter Fencing. The application is accompanied by a Natura Impact Statement

Washington House , Cregg , Rosses Point

78m
2053CONDITIONAL21 Feb 2020

Development consisting of the material change of use of an existing private residentiual apartment to short-term lettings accommodation. The apartment is located above our domestic garage

Washington Lodge , Cregg , Rosses Point

81m
2560040CONDITIONAL6 Feb 2025

re-construction of an outdoor pergola area to include glazing, replacement of existing front door and entrance gate, and all associated works

Washington House , Cregg Rosses Point , Co. Sligo

104m
2360279CONDITIONAL18 Oct 2023

(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the front of the dwelling; (c) the construction of a storey and a half detached leisure building, (d) the creation of a new site entrance from the public road with gates and pillars, (e) the installation of a new tertiary treatment system with infiltration/treatment area and (f) associated site works.

St. Helen's , Cregg Rosses Point , Co. Sligo

276m
2660153CONDITIONAL28 Apr 2026

to retain detached building to rear of an existing dwelling house

Cregg , Co. Sligo , F91 X4H0

474m
20195CONDITIONAL2 Jul 2020

development consisting of the following: installation and construction of 2 detached 80m2 General Portacabin Classrooms on site with all associated site works including connection to onsite services

St Cecilia's School , Cregg , Co. Sligo

475m
2360216N/A19 Aug 2023

The Owner of the facility at Cregg Village is experiencing very high electrical energy usage on site. The facility has now become fully occupied and active in its capacity as temporary accommodation for refugees fleeing the ongoing conflict in Ukraine. To alleviate the high energy usage, costs and associated carbon footprint, the owner of the facility is looking to obtain planning permission to supply and install a new 600kWp Ground mounted, The proposed ground mounted PV system shall be installed over two (2) number Phases. Phase 1 shall consist of 300kW of ground mounted solar PV being installed to meet the facilities current on site electrical demand. It is envisaged that Phase 2 will progress at a later date in tandem with the facilities planned electrification of their heating system over the coming Five (5) years. The 300kW installed under Phase 2 will be designed to meet the electrical input power required to satisfy the thermal loadings of future heat pump systems. The primary purpose for both phase 1 & phase 2 PV arrays will be for on site self consumption to meet the existing on site electricity usage, in instances where there is over production in summer months, the PV array will export any excess energy to the national grid under the Clean Export Guarantee (CEG). New in ground ducting shall be installed on site to reticulate DC and AC cabling back to the facilities Main Distribution Board at the boiler plant room. The proposed location for the solar PV array is not currently in use and consists of overgrown scrub, which will be cleared as required to accommodate each phase. The array will be south facing and located on unused lands to the south of the facility. To the East of the proposed array there is also a Zone of Archaeological Notification to recorded monument RMP SL008-128----Ringfort Rath located on the lands of the neighboring school "St. Cecilia's N.S.". As per our archeological survey , the new solar PV array will have zero impact on this site and natural screening of the abundant vegetation and mature trees around the monument will screen it from the proposed development. A Landscape and Visual Impact Assessment (LVIA) study was carried out on the proposal. Based on the landscape and visual impact judgements provided throughout the LVIA, the proposed Ground Mounted Solar Array is not considered to give rise to any significant residual impacts. Instead, landscape impacts are not considered to exceed ‘Moderate-slight’ s

Rosses Punto Limited , Cregg Village , Rosses Point

475m
2360250CONDITIONAL20 Sept 2023

Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.

Cregg Village , Rosses Point , Co. Sligo

486m
2660073CONDITIONAL25 Feb 2026

construction of a single story two car garage to the rear of the existing property together with all associated site works. The gross internal floor area of the proposed garage is to measure 114 square meters

Moylin House , Ballyweelin , Rosses Point Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?