← Back to search

St. Helen's , Cregg Rosses Point , Co. Sligo

CONDITIONAL

Planning application 2360279

Sligo - Sligo County Council

Proposed Development

(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the front of the dwelling; (c) the construction of a storey and a half detached leisure building, (d) the creation of a new site entrance from the public road with gates and pillars, (e) the installation of a new tertiary treatment system with infiltration/treatment area and (f) associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Oct 2023

  2. Decision due

    12 Dec 2023

  3. Decision: CONDITIONAL

    12 Dec 2023

  4. Grant issued

    24 Jan 2024

Application Details

Location
St. Helen's , Cregg Rosses Point , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.86 ha

Timeline

Registration Date
18 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 December 2023
Grant Date
24 January 2024
Permission Expires
23 January 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

104m
19103REFUSED21 Mar 2019

Development consisting of the construction of a dwelling with a waste water treatment system, packaged tertiary treatment system and distribution area, soak away for storm drainage and all ancillary site works. A Natura Impact Statement is submitted to the planning authority with the application.

Cregg , Rosses Point , Co Sligo

104m
22145REFUSED26 Apr 2022

development consisting of (1) partial demolition of existing boat shed (2) conversion of boat shed & erection of dwelling in lieu (3) wastewater treatment system (4) and all associated site works

Cregg , Rosses Point , Co. Sligo

177m
2151CONDITIONAL22 Feb 2021

development consisting of the construction of a Synthetic Grass Tennis Court with Perimeter Fencing. The application is accompanied by a Natura Impact Statement

Washington House , Cregg , Rosses Point

177m
2053CONDITIONAL21 Feb 2020

Development consisting of the material change of use of an existing private residentiual apartment to short-term lettings accommodation. The apartment is located above our domestic garage

Washington Lodge , Cregg , Rosses Point

180m
2560040CONDITIONAL6 Feb 2025

re-construction of an outdoor pergola area to include glazing, replacement of existing front door and entrance gate, and all associated works

Washington House , Cregg Rosses Point , Co. Sligo

254m
2660153CONDITIONAL28 Apr 2026

to retain detached building to rear of an existing dwelling house

Cregg , Co. Sligo , F91 X4H0

435m
20195CONDITIONAL2 Jul 2020

development consisting of the following: installation and construction of 2 detached 80m2 General Portacabin Classrooms on site with all associated site works including connection to onsite services

St Cecilia's School , Cregg , Co. Sligo

441m
17102CONDITIONAL21 Mar 2017

development consisting of the renovation and extension of existing dwelling and the upgrading of the existing on-site wastewater treatment system to a new mechanical aeration unit with 2 no. puraflo modules on a gravel distribution layer and all other associated site works and services

Rose Cottage , Ballincar , Co. Sligo

457m
19340CONDITIONAL16 Aug 2019

development consisting of the installation and construction of detached 80m2 general portacabin classroom on site with all associated site works including connection to onsite services.

St. Cecilia's School , Cregg , Co. Sligo

472m
2360250CONDITIONAL20 Sept 2023

Development consisting of the Installation of 600kw (1,696m2) Of ground mounted solar PV array and associated site works and services. The ground mounted PV array will be installed over two (2) number phases. Phase 1, which will consist of 300kw of ground mounted solar PV to meet the facilities current onsite electrical requirements. Phase 2, will also consist of another 300kw Of ground mounted solar PV. It Is envisaged that Phase 2 will progress in tandem with the facilities planned electrification of their heating system over the coming five (5) years. Included In this application is a visual impact assessment, an appropriate assessment screening, an ecological impact assessment report, a glint & glare assessment & an archaeological impact assessment.

Cregg Village , Rosses Point , Co. Sligo