Rosses Upper , Ballyweelin , Cregg Ballincar and Shannon Eighter
CONDITIONALPlanning application 20408
Sligo - Sligo County Council
Proposed Development
development consisting of the following (1) upgrade of the existing Wastewater Pumping Station (PSE3) at Rosses Upper including: remedial works to existing underground pumping chamber, new underground stormwater storage tank with associated kiosks, pipelines, ducting and vent stack, new emergency overflow to connect to existing outfall pipeline, new prefabricated welfare cabin, new gabion retaining wall structure and a 2.4m high weld mesh fence internal to the site, replace existing masonry front boundary with a new 2.4m high stone-faced boundary wall incorporating a railing and new vehicle access gates, together with all associated site development works (2) decommission existing wastewater treatment plant and construction of new Pumping Station (PS2) at Ballyweelin including: demolish existing single storey building, decommission existing septic tank, replace existing boundary fence with new 2.4m weld mesh fence. Construction of underground pumping chamber with associated valve chambers, manholes, kiosks, pipelines, ducting and vent stack, new emergency overflow to connect to existing outfall pipeline, together with all associated site development works. Upgrade works to existing access road together with replacement of existing access road fence with 1.2m high concrete post and chainlink fence, and all associated site development works. (3) construction of a new 90mm diameter rising main from Pumping Station PS2 at Ballyweelin to connect to the existing gravity sewer on Regional Road R291, overall length 250m approximately. (4) construction of new 225mm diameter sewer on Colmcille Drive in Rosses Upper to replace existing 150mm diameter sewer, overall length 150m approximately. (5) construction of new 375mm diameter foul sewer, overall length 115m approximately and new 450mm diameter foul sewer, overall length 590m approximately between Colmcille Drive and existing Pumping Station (PSE3) on the Main Street in Rosses Point. Decommissioning of approximately 460m of existing Cast Iron watermain and transfer of associated service connections to the existing uPVC watermain. A Natura Impact Statement (NIS) accompanies this Planning Application. (PLEASE NOTE THAT THE FULL COMPREHENSIVE DESCRIPTION IS AVAILABLE FOR VIEWING ON FILE OR ON EPLAN SYSTEM, UNDER HEADING CORRESPONDENCE - DESCRIPTION)
View the full application file on the council's planning portal →Application Timeline
Application received
1 Dec 2020
Decision: CONDITIONAL
1 Feb 2021
Decision due
3 Feb 2021
Grant issued
10 Mar 2021
Application Details
- Location
- Rosses Upper , Ballyweelin , Cregg Ballincar and Shannon Eighter
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 10.51 ha
Timeline
- Registration Date
- 1 December 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 February 2021
- Grant Date
- 10 March 2021
- Permission Expires
- 9 March 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the renovation and extension of existing dwelling and the upgrading of the existing on-site wastewater treatment system to a new mechanical aeration unit with 2 no. puraflo modules on a gravel distribution layer and all other associated site works and services
Rose Cottage , Ballincar , Co. Sligo
Renovation and heightening of existing granny flat
8 Seapark , Ballincar , Co. Sligo
(a) the construction of two split level side extensions and a single storey rear extension following the demolition of the existing left hand side extension and existing extensions to the rear elevation; (b) the incorporation of a new garage area into the existing topography of the land to the front of the dwelling; (c) the construction of a storey and a half detached leisure building, (d) the creation of a new site entrance from the public road with gates and pillars, (e) the installation of a new tertiary treatment system with infiltration/treatment area and (f) associated site works.
St. Helen's , Cregg Rosses Point , Co. Sligo
development consisting of extensions and alterations to existing dwelling including the following: (a) single storey extension incorporating additional bedroom, interior alterations and granny flat accommodation to the east gable end of the existing dwelling (b) replacement of the existing septic tank and percolation area which is currently a combined system serving the adjacent dwelling to the east with a new septic tank and percolation area serving the dwelling only, together with all associated site works
Weatherly , Ballincar , Co. Sligo
development consisting of the replacement of the existing septic tank and percolation area which is currently a combined system serving the adjacent dwelling to the west with new proprietary effluent treatment unit and tertiary treatment system serving this dwelling only, together with all associated site works
Easy Reach , Ballincar , Co. Sligo
Development consisting of the construction of a dwelling with a waste water treatment system, packaged tertiary treatment system and distribution area, soak away for storm drainage and all ancillary site works. A Natura Impact Statement is submitted to the planning authority with the application.
Cregg , Rosses Point , Co Sligo
development consisting of (1) partial demolition of existing boat shed (2) conversion of boat shed & erection of dwelling in lieu (3) wastewater treatment system (4) and all associated site works
Cregg , Rosses Point , Co. Sligo
Development consisting of: 1. Demolition of existing single storey utility room and boiler house, 2. Construction of a single storey extension to the rear to include a terrace area, 3. Conversion of the existing garage and basement storage area into 'granny flat' accommodation. This will include the construction of a basement level extension to the southern gable elevation. 4. Construction of new windows on the rear gable elevation and partially block up existing sitting room window on the southern gable elevation, 5. Carrying out of minor alterations to existing elevations as part of proposed upgrade works and 6. Reconnection to all existing site services and 7. Carrying out of all associated site development works deemed necessary
6 Ballincar Heights , Ballincar , Co Sligo
Retention of the following: Construction of 2nr additional dormer windows on the rear (northern elevation). Omission of 1nr original dormer window and replacement with a roof window in-lieu on the rear (northern elevation). Alterations to fenestrations on sides and rear elevations as constructed, Alteration to front porch roof from hip to ‘A’ roof design. Alteration of hip on rear roof to ‘A’ roof design. Addition of 2nr roof windows on the eastern & western roof planes of rear roof structure serving stairwell / landing area. Extension to the rear of the existing kitchen which includes a new link corridor to existing hallway and the erection of a new rear porch entrance at the basement level (northern elevation) & Planning Permission for the following:To construct of a new on-site PET system with percolation area to replace the existing FW discharge system. Reconnection to existing site services & All associated site development works deemed necessary
Ballincar , Sligo , Co. Sligo
development consisting of the following: construction of a new two-storey three bedroom dwelling house and onsite wastewater treatment system together with all associated site works including amendments to and retention of existing gateway
Glenard , Ballincar , Co. Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?