← Back to search

Unit 13, Greenhills Business Centre, Hibernian Industrial Estate, Greenhills Road, Dublin 24, D24N673

Grant Permission for Retention

Planning application SD24A/0189W

Dublin - South Dublin County Council

Proposed Development

The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Aug 2024

  2. Decision: Grant Permission for Retention

    24 Sept 2024

  3. Decision due

    26 Sept 2024

  4. Grant issued

    8 Nov 2024

Application Details

Location
Unit 13, Greenhills Business Centre, Hibernian Industrial Estate, Greenhills Road, Dublin 24, D24N673
Applicant
N/A
Application Type
Retention
Planning Authority
South Dublin County Council
Eircode
D24N673
Site Area
120 ha

Timeline

Registration Date
2 August 2024
Status
Final Grant
Decision
Grant Permission for Retention
Decision Date
24 September 2024
Grant Date
8 November 2024
Permission Expires
7 November 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
SD17A/0469Granted22 Dec 2017

Construction of a new 2 storey building (c.8229sq.m) for use as a data storage facility. The new facility will be an annex to, and accessed through, the neighbouring data storage facility to the north via the existing site entrance serving same. The development will include electrical rooms for electronic operations, mechanical plant rooms and support areas including offices and welfare facilities, a loading bay and back-up generators in a fenced compound. Existing boundary structures including railings, fencing and gates will be replaced with a new 3, high perimeter railing. Ventilation plant at roof level will be screened from view on all sides (all at the former Barretts site).

Greenhills Business Park, Greenhills Road, Dublin 24

36m
S02A/0141Granted2 May 2002

Retention sought for internal mezzanine store and modifications.

8 Greenhills Business Centre, Greenhills Road, Dublin 24.

43m
ED16/0032Declared Exempt31 May 2016

Change of use from warehouse to food production & warehouse. Install an oven, bake bread & cakes & distribute to shops.

Unit 6, Greenhills Business Centre, Greenhills Road, Tallaght, Dublin 24

52m
SD16A/0452Granted22 Dec 2016

Demolition of (1) the existing industrial buildings and (2) ancillary outbuildings and structures on the site. The total floor area of the buildings proposed to be demolished is c. 4,658sq.m. The works do not affect boundary structures such as railings, fencing and gates.

Former Barretts Site, Greenhills Business Park, Greenhills Road, Tallaght, Dublin 24

62m
ED16/0044Declared Not Exempt9 Aug 2016

(a) Increase existing 2.4m railings to front boundary to 3.1m high; (b) increase existing 2.4m high palisade fencing to east & south boundaries to 3.1m high

Dub 53, Greenhills Road, Tallaght, Dublin, 24

72m
ED22/0021Declared Exempt20 Jun 2022

The development will comprise: (1) The Installation of 2 no. new Air Handling Units & associated ducts externally to the existing south façade in place of the previously permitted ( Planning Permission SD13A/0266) generator units. (2) External alterations to existing south façade to incorporate flashings to new wall penetrations. (3) Construction of perimeter fence as per previously permitted (Planning Reference SD17A/0448). (4) Associated site works to perimeter road in order to provide safe pedestrian access & Crossings

Former Shinko Microelectronics Site, Greenhills Business Park, Greenhills Road, Tallaght, Dublin 24.

74m
SD13A/0266Granted20 Dec 2013

Demolition of the existing industrial building and ancillary structures on the site.

Former Shinko Building, Greenhills Road, Tallaght, Dublin 24

74m
S99A/0798Granted11 Nov 1999

Upgrade existing tertiary site entrance including the replacement of the existing gate.

Greenhills Centre, Greenhills Road, Tallaght, Dublin 24.

74m
SD16A/0427Granted9 Dec 2016

Upgrade of the existing boundary railings and palisade fence by increasing the height of the existing fencing and railings by 0.7 meters to the overall site boundary.

DUB 53, Greenhills Road, Tallaght, Dublin, 24

74m
SD17A/0448Grant Permission for Retention15 Dec 2017

Retention of alterations to previously granted planning permission, Reg. Ref. SD14A/0232: (1) Modification to the site entrance arrangement at the north boundary, including the omission of the security hut and the redesign of gates; (2) redesign of the sprinkler water tank and pump house compound; (3) relocation of the humidifier pump house and tanks to the south eastern corner of the main building, with the redesigned tank room enclosed within the main building; (4) rearrangement of the stand by generators layout; (5) relocation of the temporary substation to the south western corner of the main building; (6) new enclosure to stand-by generators; (7) rearrangement of the accessible parking spaces; (8) 164sq.m of added circulation, loading and storage accommodation at ground floor level and 9sq.m at mezzanine level; (9) changes to the main building to facilitate access to the relocated loading bay; (10) internal layout changes to offices and west storage bay areas with associated elevational changes; (11) 79sq.m of additional accommodation at first floor level with associated elevational changes; and (12) enlargement of louvered wall vents on the south elevation. The total added accommodation equals 252sq.m.

Former Shinko Microelectronics Site, Greenhills Business Park, Greenhills Road, Tallaght, Dublin 24.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?